All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 14:19, 15 April 2019 Mnemphos (talk | contribs) automatically marked revision 6215 of page Maryland State-Owned Roadway Access Management patrolled
- 14:18, 15 April 2019 Mnemphos (talk | contribs) automatically marked revision 6214 of page Maryland State-Owned Roadway Access Management patrolled
- 13:50, 15 April 2019 Mnemphos (talk | contribs) automatically marked revision 6213 of page MDOT Policy patrolled
- 15:48, 7 January 2019 Mnemphos (talk | contribs) automatically marked revision 6212 of page MDOT 640 Bus Rapid Transit patrolled
- 13:24, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.05 Determination and Extension Contract Time (content was: "The Contractor shall complete the work contracted for in an acceptable manner within the number of working days, calendar days, or calend...", and the only contributor was "Bdeane" (talk))
- 13:15, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.04 Cultural Resources (content was: "The Contractor shall be aware of the potential of cultural resources on the project. During the construction phase, whenever anything th...", and the only contributor was "Bdeane" (talk))
- 13:13, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.03 Subcontracting and Subcontractors (content was: "In addition to the provisions of GP 8.01 (Subcontracting), the following shall apply on Administration Contracts: The subcontractors na...", and the only contributor was "Bdeane" (talk))
- 13:10, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.02 Notice to Proceed and Project Schedule (content was: "Within 45 days after the Contract has been executed, the Administration will issue to the Contractor a Notice to Proceed. This notice wi...", and the only contributor was "Bdeane" (talk))
- 13:09, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.01 Insurance (content was: "In addition to the provisions of GP 7.14 (Liability Insurance), the following shall apply on Administration Contracts. The Contractor s...", and the only contributor was "Bdeane" (talk))
- 13:07, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.14 Storing Materials and Equipment On/Against Structures Restriction (content was: "Materials and equipment shall not be stored on or against any structure unless written permission is obtained from the Administration’s...", and the only contributor was "Bdeane" (talk))
- 13:07, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.13 Hauling Over Proposed Structures (content was: "If the Contractor desires to haul across the proposed structures, they shall first apply for and obtain written permission from the Admin...", and the only contributor was "Bdeane" (talk))
- 13:05, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.11 Construction and Waste Material (content was: "All wood, trash, debris, and other foreign matter shall be removed from within the right of way limits and disposed of by the Contractor....", and the only contributor was "Bdeane" (talk))
- 13:05, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.12 Structure Underclearances and Overhead Clearances (content was: "'''General.''' The requirements for underclearances at structures shall apply to the entire usable roadway areas including shoulders. U...", and the only contributor was "Bdeane" (talk))
- 13:04, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.10 Recycled or Rehandled Material (content was: "For recycled or rehandled material furnished by the Contractor for use on the project, the Engineer may require the Contractor to have th...", and the only contributor was "Bdeane" (talk))
- 13:04, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.09 Hazardous Material (content was: ":'''(a)''' If the Contractor encounters or exposes during construction any abnormal conditions that indicate the presence of a hazardous...", and the only contributor was "Bdeane" (talk))
- 13:03, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.08 Aerial Electric Lines (750 Volts or More) (content was: " The Contractor shall be aware that State law requires that a 10 foot radial clearance shall be maintained for all construction equipment...", and the only contributor was "Bdeane" (talk))
- 13:02, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.07 Use of Explosives (content was: "All blasting operations, including the storage and handling of explosives and blasting agents, shall be performed in conformance with the...", and the only contributor was "Bdeane" (talk))
- 13:02, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.06 Bridges and Other Work in or over Waters of the State (content was: "All work in, on, or over waters under control of the Department of the Army or the Environmental Protection Agency of the United States s...", and the only contributor was "Bdeane" (talk))
- 13:01, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.05 Railroad Highway Grade Crossings and Separations (content was: "When the Contractor is required to haul materials across the tracks of any railroad, or elects to do so, the Contractor shall make arrang...", and the only contributor was "Bdeane" (talk))
- 12:58, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.04 Restoration of Surfaces Opened by Permit (content was: "The right to construct or reconstruct any utility in the highway or to grant permits for same at any time is reserved by the Administrati...", and the only contributor was "Bdeane" (talk))