Utilities | ||
ContentsPrimary GuidanceStorm Water Management
Electric
| ||
DiscussionStorm Water ManagementMinimum depth consideration is warranted where large diameter pipes cross major thoroughfares subject to vehicle loads in excess of standard highway trucks. Alternatively, special pipe bedding or pavement section may be used as appropriate. State highway and municipal manhole and cover standards are typically structurally insufficient for extreme axle loads from the cited design vehicles. ElectricCost-benefit studies to convert to primary power is warranted where the electrical maintenance expertise and resources are available on staff or can be readily contracted. Evaluating and providing electrical system redundancy for high demand and critical facilities is appropriate where:
Combining redundant supply methods should be based on security and operational need for power continuity, off-terminal distribution grid and secondary feeder(s) proximity, maintenance personnel available to exercise backup generators and air quality permitting requirements for generators. See Also |