All public logs

From MDOT Policy Manual
Jump to: navigation, search

Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs      

 

Show patrol log | Show tag log

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)
  • 12:41, 30 October 2018 Ukelly (talk | contribs) deleted page 402 STRUCTURE EXCAVATION (Class 3) (content was: "======'''402.01 DESCRIPTION.'''====== :Excavate and backfill for construction of bridges, box culverts, and other major structures. ======'''402.02 MATERIALS.'''====== :{| |Crusher Run Aggregate CR-6 |     &nb...")
  • 12:41, 30 October 2018 Ukelly (talk | contribs) deleted page 401 MAINTAINING EXISTING BRIDGE DECK DURING LIFE OF CONTRACT (content was: "======'''401.01 DESCRIPTION. '''====== :Patch the existing bridge deck as required for maintenance of traffic. ======'''401.02 MATERIALS. '''====== :{| |Rapid Hardening Cementitious Material for Concrete Pavement Repairs | &n...")
  • 12:41, 30 October 2018 Ukelly (talk | contribs) deleted page 316 STORMWATER MANAGEMENT (SWM) FILTRATION FACILITIES (content was: "======'''316.01 DESCRIPTION.'''====== :Construct stormwater management (SWM) filtration facilities as specified. :'''SWM Filtration Facilities Identification.''' SWM filtration facilities are identified by unique six-digit inventory nu...")
  • 12:41, 30 October 2018 Ukelly (talk | contribs) deleted page 315 INFILTRATION TRENCHES (content was: "======'''315.01 DESCRIPTION.'''====== :Install infiltration trenches as specified. ======'''315.02 MATERIALS.'''====== :{| |Riprap |      901.02, Class I |- |Geotextile, Class as specif...")
  • 12:40, 30 October 2018 Ukelly (talk | contribs) deleted page 314 FLOWABLE BACKFILL (content was: "======'''314.01 DESCRIPTION.'''====== :Furnish, haul, and place flowable cement stabilized backfill material. When specified, use for utility cut backfill, pipe backfill, or for filling abandoned pipes. ======'''314.01 MATERIALS.'''===...")
  • 12:40, 30 October 2018 Ukelly (talk | contribs) deleted page 312 RIPRAP SLOPE AND CHANNEL PROTECTION (content was: "======'''312.01 DESCRIPTION.'''====== :Protect slopes and channels with a covering of geotextile and riprap or an aggregate filter blanket. ======'''312.02 MATERIALS.'''====== :{| |Aggregate Filter Blanket |    &nb...")
  • 12:40, 30 October 2018 Ukelly (talk | contribs) deleted page 313 GABIONS (content was: "======'''313.03 DESCRIPTION.'''====== :Protect slopes and channels by placing stone filled wire baskets. ======'''313.02 MATERIALS.'''====== :{| |Stone for Gabions |      901.05 |- |Wir...")
  • 12:40, 30 October 2018 Ukelly (talk | contribs) deleted page 311 RIPRAP DITCHES (content was: "======'''311.01 DESCRIPTION.'''====== :Construct riprap ditches and riprap ditches with capping. ======'''311.02 MATERIALS.'''====== :{| |Riprap |      901.02 and .03...")
  • 12:40, 30 October 2018 Ukelly (talk | contribs) deleted page 310 CONCRETE SLOPE AND CHANNEL PROTECTION (content was: "======'''310.01 DESCRIPTION.'''====== :Protect slopes and channels with cast in place concrete and cutoff walls. ======'''310.02 MATERIALS.'''====== :{| |Crusher Run Aggregate CR-6 |      901 AGGREGATES...")
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 309 CONCRETE DITCHES (content was: "======'''309.01 DESCRIPTION.'''====== :Construct concrete ditches and incidental toe walls. ======'''309.02 MATERIALS.'''====== :{| |Crusher Run Aggregate CR-6 |      901.01 |- |No. 57...")
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 308 EROSION AND SEDIMENT CONTROL (content was: "======'''308.01 DESCRIPTION.'''====== :Apply and maintain erosion and sediment control measures to disturbed areas throughout the life of the project to control erosion and to minimize sedimentation in rivers, streams, lakes, reservoirs...")
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 307 PREFABRICATED EDGE DRAINS (content was: "======'''307.01 DESCRIPTION.'''====== :Construct prefabricated edge drain systems and underdrain pipe outlets. ======'''307.02 MATERIALS.'''====== :{| |Outlet Pipe |      905 |- |Select Borro...")
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL (content was: "======'''306.01 DESCRIPTION.'''====== :Construct underdrains, subgrade drains, underdrain for spring control, underdrain pipe outlets, and blind drains using pipe, geotextile, and granular material. Clean existing underdrain outlets. =...")
  • 12:38, 30 October 2018 Ukelly (talk | contribs) deleted page 305 MISCELLANEOUS STRUCTURES (content was: "======'''305.01 DESCRIPTION.'''====== :Construct miscellaneous cast in place concrete or masonry drainage structures, furnish and install precast concrete drainage structures, and clean existing drainage structures including but not lim...")
  • 12:38, 30 October 2018 Ukelly (talk | contribs) deleted page 303 PIPE CULVERTS (content was: "======'''303.01 DESCRIPTION.'''====== :Furnish and install pipe culverts, make connections to miscellaneous structures and other pipe culverts, reinstall existing pipes, remove existing pipe culverts, abandon existing pipes, and clean e...")
  • 20:11, 29 October 2018 Ukelly (talk | contribs) deleted page 302 SELECTED BACKFILL (content was: "======'''302.01 DESCRIPTION.'''====== :Place selected backfill material and compact. ======'''302.02 MATERIALS.'''====== :{| |No. 57 Aggregate |      901.01 |- |Crusher Run Aggregate CR...")
  • 20:10, 29 October 2018 Ukelly (talk | contribs) deleted page 106 HOT MIX ASPHALT (HMA) FOR MAINTENANCE OF TRAFFIC (content was: "======'''106.01 DESCRIPTION.'''====== :Place HMA for maintenance of traffic. ======'''106.02 MATERIALS.'''====== :{| |Tack Coat (Rapid Setting) |      904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPH...")
  • 20:06, 24 October 2018 Ukelly (talk | contribs) deleted page 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS (content was: "======'''304.01 DESCRIPTION.'''====== :Furnish and install structural plate pipe and structural plate pipe arch culverts. ======'''304.02 MATERIALS.'''====== :{| |No. 57 Aggregate |      901 AGGREGATES|...")
  • 20:05, 24 October 2018 Ukelly (talk | contribs) deleted page 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION (content was: "======'''301.01 DESCRIPTION.'''====== :Excavate below the specified elevation when unsuitable subgrade material is encountered. ======'''301.02 MATERIALS.'''====== :Not applicable. ======'''301.03 CONSTRUCTION.'''====== :Excavate to...")
  • 19:36, 24 October 2018 Ukelly (talk | contribs) deleted page 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE (content was: "======'''211.01 DESCRIPTION.'''====== :Furnish and place a layer of geotextile and 12 in. of graded aggregate base to bridge unstable material and minimize the use of undercutting. Use this item only when specified or directed. In extr...")
  • 19:35, 24 October 2018 Ukelly (talk | contribs) deleted page 210 TAMPED FILL (content was: "======'''210.01 DESCRIPTION.'''====== :Compact the embankment and backfill materials by means of mechanical tampers or vibratory compactors. Use this method of compaction wherever materials cannot be adequately compacted by other appro...")
  • 19:35, 24 October 2018 Ukelly (talk | contribs) deleted page 209 TRIMMING EXISTING DITCHES (content was: "======'''209.01 DESCRIPTION.'''====== :Trim, slope, and shape existing ditches within the limits and to the lines and grades specified. Clearing and grubbing and the removal and disposal of surplus or unsuitable materials are included...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 208 SUBGRADE PREPARATION (content was: "======'''208.01 DESCRIPTION.'''====== :Prepare, protect, and maintain the subgrade prior to the construction of succeeding courses. ======'''208.02 MATERIALS.'''====== :Section 916. ======'''2...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 207 REMOVAL OF EXISTING MASONRY (content was: "======'''207.01 DESCRIPTION.'''====== :Remove all or part of existing concrete, concrete block, brick, or stone structures (headwalls, toe walls, etc.), including concrete piles. Refer to 405 REMOVAL OF EXISTING STRUCTURES|Section 40...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 206 REMOVAL OF EXISTING PAVEMENT, SIDEWALK, PAVED DITCHES, CURB, OR COMBINATION CURB AND GUTTER (content was: "======'''206.01 DESCRIPTION.'''====== :Remove to full depth and dispose of existing pavement, sidewalk, paved ditches, curb, or combination curb and gutter. ======'''206.02 MATERIALS.'''====== :Not applicable. ======'''206.03 CONST...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 205 TEST PIT EXCAVATION (content was: "======'''205.01 DESCRIPTION.'''====== :Excavate and backfill test pits to determine the location of underground structures and utilities. ======'''205.02 MATERIALS.'''====== :Not applicable. ======'''205.03 CONSTRUCTION.'''====== :...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 204 EMBANKMENT AND SUBGRADE (content was: "======'''204.01 DESCRIPTION.'''====== :Construct embankment and subgrade using suitable material obtained from roadway, structure, borrow, and other excavation included in the Contract. Place, process, and compact material to the specifi...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 203 BORROW EXCAVATION (content was: "======'''203.01 DESCRIPTION.'''====== :Furnish, excavate, haul, and place approved materials for embankments and backfills when sufficient quantities of suitable materials are not available from other excavations specified in the Contrac...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 202 CHANNEL OR STREAM CHANGE EXCAVATION (CLASS 5) (content was: "======'''202.01 DESCRIPTION.'''====== :Excavate for changes in channels or streams when specified. Use all suitable material for the construction of the project. Dispose of unsuitable material as directed. ======'''202.02 MATERIALS.''...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) (content was: "======'''201.01 DESCRIPTION.'''====== :Excavate and grade for roadways and appurtenances to the lines and grades specified. :'''201.01.01 Classification.''' ::CLASS 1 — All excavation where the width of the bottom of the cut is...")
  • 19:32, 24 October 2018 Ukelly (talk | contribs) deleted page 120 TREE PRESERVATION (content was: "======'''120.01 DESCRIPTION.'''====== :Establish and maintain a Tree Preservation Area (TPA). ======'''120.02 MATERIALS.'''====== :{| |Temporary Orange Construction Fence |      104 MAINTENANCE OF T...")
  • 19:32, 24 October 2018 Ukelly (talk | contribs) deleted page 115 THRU 119 — RESERVED (content was: "======'''RESERVED'''====== Category:2017 Standard Specifications For Construction And Materials")
  • 19:32, 24 October 2018 Ukelly (talk | contribs) deleted page 114 TRUCK STAGING AREAS AND IDLING REQUIREMENTS (content was: "======'''114.01 DESCRIPTION.'''====== :Locate truck staging areas and avoid unnecessary idling of construction equipment in order to reduce engine emissions and to provide air quality benefits to those who live or work in or adjacent to...")
  • 19:31, 24 October 2018 Ukelly (talk | contribs) deleted page 112 THRU 113 — RESERVED (content was: "======'''RESERVED'''====== Category:2017 Standard Specifications For Construction And Materials")
  • 19:31, 24 October 2018 Ukelly (talk | contribs) deleted page 111 SAMPLING DEVICES, TESTING AND SAFETY EQUIPMENT (content was: "======'''111.01 DESCRIPTION.'''====== :Furnish and maintain Sampling Devices and Testing and Safety Equipment with accessories that are required to sample and test materials used on the project. The sampling and testing and safety equipm...")
  • 19:31, 24 October 2018 Ukelly (talk | contribs) deleted page 110 ACTIVITIES CHART PROJECT SCHEDULE (content was: "======'''110.01 DESCRIPTION.'''====== :Plan, schedule, and construct the project using an Activities Chart (AC). The AC shall break down into detail the Contract time required to perform the work activities for the duration of the proj...")
  • 19:31, 24 October 2018 Ukelly (talk | contribs) deleted page 109 CRITICAL PATH METHOD PROJECT SCHEDULE (content was: "======'''109.01 DESCRIPTION.'''====== :Plan, schedule, and construct the project by using a Critical Path Method Project Schedule (CPM). Use the CPM for coordinating and monitoring the work specified in the Contract Documents including...")
  • 19:30, 24 October 2018 Ukelly (talk | contribs) deleted page 108 MOBILIZATION (content was: "======'''108.01 DESCRIPTION.'''====== :Construction preparatory operations that include the movement of personnel and equipment to the project site and the establishment of the Contractor's offices, buildings, and other facilities nece...")
  • 19:30, 24 October 2018 Ukelly (talk | contribs) deleted page 107 CONSTRUCTION STAKEOUT (content was: "======'''107.01 DESCRIPTION.'''====== :Furnish, place, and maintain construction layout stakes. Demarcate (flag) the Limit of Disturbance (LOD), and protected resources including, wetlands, wetland buffers, waters of the United States,...")
  • 19:30, 24 October 2018 Ukelly (talk | contribs) deleted page 106 ASPHALT MIXES FOR MAINTENANCE OF TRAFFIC (content was: "======'''106.01 DESCRIPTION.'''====== :Place asphalt mix for maintenance of traffic. ======'''106.02 MATERIALS.'''====== :{| |Tack Coat (Rapid Setting) |      904 PERFORMANCE GRADED ASPHALT BINDERS...")
  • 19:29, 24 October 2018 Ukelly (talk | contribs) deleted page 105 AGGREGATE FOR MAINTENANCE OF TRAFFIC (content was: "======'''105.01 DESCRIPTION.'''====== :Place aggregate material for the maintenance of traffic. ======'''105.02 MATERIALS.'''====== :{| |Crusher Run Aggregate CR-6 |      901 AGGREGATES#901.01|901....")
  • 19:29, 24 October 2018 Ukelly (talk | contribs) deleted page 104 MAINTENANCE OF TRAFFIC (content was: " ===='''104.00 GENERAL.'''==== :This Section sets forth the traffic control requirements necessary for the safe and continuous maintenance of traffic throughout the area affected by the work, and is intended to minimize inconveniences to...")
  • 19:28, 24 October 2018 Ukelly (talk | contribs) deleted page 103 ENGINEERS OFFICE (content was: "======'''103.01 DESCRIPTION.'''====== :Furnish, clean, and maintain in good condition an Engineers office at an approved location within the immediate vicinity of the project. The office shall be separate from any offices used by the Con...")
  • 19:18, 24 October 2018 Ukelly (talk | contribs) deleted page 102 REMOVAL AND DISPOSAL OF EXISTING BUILDINGS (content was: "======'''102.01 DESCRIPTION.'''====== :Remove and dispose of existing buildings, including foundations, footings, or any part thereof, and backfill as specified. Locations of buildings included in the work will be designated in the Contr...")
  • 19:17, 24 October 2018 Ukelly (talk | contribs) deleted page Category:CATEGORY 100 - PRELIMINARY (content was: "Category:2017 Standard Specifications For Construction And Materials", and the only contributor was "Bgilardi" (talk))
  • 19:07, 24 October 2018 Ukelly (talk | contribs) deleted page 101 CLEARING AND GRUBBING (content was: "======'''101.01 DESCRIPTION.'''====== :Clear and grub within the specified limits. :'''101.01.01 Definitions.''' ::'''(a) Clearing.''' The removal and disposal of trees, fallen timber and rotten wood, brush, shrubs, vegetation, rubbis...")
  • 18:01, 22 May 2018 User account Mahsan (talk | contribs) was created by Ukelly (talk | contribs) (for admin account)
  • 13:10, 16 May 2018 User account Tgood (talk | contribs) was created by Ukelly (talk | contribs)
  • 13:09, 16 May 2018 User account Uzafar (talk | contribs) was created by Ukelly (talk | contribs)
  • 15:45, 22 February 2018 User account Ukelly (talk | contribs) was created
(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)