All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 13:07, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.14 Storing Materials and Equipment On/Against Structures Restriction (content was: "Materials and equipment shall not be stored on or against any structure unless written permission is obtained from the Administration’s...", and the only contributor was "Bdeane" (talk))
- 13:07, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.13 Hauling Over Proposed Structures (content was: "If the Contractor desires to haul across the proposed structures, they shall first apply for and obtain written permission from the Admin...", and the only contributor was "Bdeane" (talk))
- 13:05, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.11 Construction and Waste Material (content was: "All wood, trash, debris, and other foreign matter shall be removed from within the right of way limits and disposed of by the Contractor....", and the only contributor was "Bdeane" (talk))
- 13:05, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.12 Structure Underclearances and Overhead Clearances (content was: "'''General.''' The requirements for underclearances at structures shall apply to the entire usable roadway areas including shoulders. U...", and the only contributor was "Bdeane" (talk))
- 13:04, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.10 Recycled or Rehandled Material (content was: "For recycled or rehandled material furnished by the Contractor for use on the project, the Engineer may require the Contractor to have th...", and the only contributor was "Bdeane" (talk))
- 13:04, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.09 Hazardous Material (content was: ":'''(a)''' If the Contractor encounters or exposes during construction any abnormal conditions that indicate the presence of a hazardous...", and the only contributor was "Bdeane" (talk))
- 13:03, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.08 Aerial Electric Lines (750 Volts or More) (content was: " The Contractor shall be aware that State law requires that a 10 foot radial clearance shall be maintained for all construction equipment...", and the only contributor was "Bdeane" (talk))
- 13:02, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.07 Use of Explosives (content was: "All blasting operations, including the storage and handling of explosives and blasting agents, shall be performed in conformance with the...", and the only contributor was "Bdeane" (talk))
- 13:02, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.06 Bridges and Other Work in or over Waters of the State (content was: "All work in, on, or over waters under control of the Department of the Army or the Environmental Protection Agency of the United States s...", and the only contributor was "Bdeane" (talk))
- 13:01, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.05 Railroad Highway Grade Crossings and Separations (content was: "When the Contractor is required to haul materials across the tracks of any railroad, or elects to do so, the Contractor shall make arrang...", and the only contributor was "Bdeane" (talk))
- 12:58, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.04 Restoration of Surfaces Opened by Permit (content was: "The right to construct or reconstruct any utility in the highway or to grant permits for same at any time is reserved by the Administrati...", and the only contributor was "Bdeane" (talk))
- 12:58, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.03 Compliance with Maryland Vehicle Laws (content was: "The Maryland Vehicle Law requires each motor vehicle, trailer, semitrailer, and pole trailer driven on a highway to be registered. Ther...", and the only contributor was "Bdeane" (talk))
- 12:55, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.02 Load and Speed Limitations (content was: "The Bidder's attention is directed to the Annotated Code of Maryland, Transportation Article, Section 24 206, authorizing the appropriate...", and the only contributor was "Bdeane" (talk))
- 12:55, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.01 Moving of Equipment (content was: "The Contractor will not be permitted to move over or operate on any road (except on the road under construction) any power shovels, rolle...", and the only contributor was "Bdeane" (talk))
- 12:54, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.08 Eliminated Items (content was: "In addition to the provisions of GP-4.04 Variations in Estimated Quantities, the following shall apply to Administration Contracts. Sho...", and the only contributor was "Bdeane" (talk))
- 12:53, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.07 Late Payments (content was: "'''(a)''' Payments for semi final estimates shall be made within 30 days of the date when the amount becomes due and payable as evidenced...", and the only contributor was "Bdeane" (talk))
- 12:51, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.06 Final Acceptance and Final Payment (content was: "'''(a)''' When the Contractor has completed a Contract, and it has been accepted for maintenance in conformance with the provisions of GP 5.13 (Acceptance for Maintenance), the Administration will promptly proceed: :# To make any necess...")
- 12:51, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.05 Progress Payments (content was: "'''(a)''' '''Current Estimate.''' :1. '''Lump Sum Contracts.''' The Contractor shall furnish an acceptable breakdown of the lump sum Co...", and the only contributor was "Bdeane" (talk))
- 12:49, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.04 Scope of Payment (content was: "Payment to the Contractor will be made from the actual quantities of Contract items performed in conformance with the Plans and Specifica...", and the only contributor was "Bdeane" (talk))
- 12:48, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.03 Force Account Work (content was: "When the Contractor is required to perform work due to additions or changes to the Contract for which there are no applicable unit prices...", and the only contributor was "Bdeane" (talk))