All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.05 Dispute Mediation (content was: "When a dispute arises out of or relates to the Contract or breach thereof, and if the dispute can not be settled through negotiation or t...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.04 Suspension of Work (content was: "In addition to the provisions of GP 8.07 (Suspension of Work), the following shall apply on Administration Contracts. The Engineer will...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.03 Use and Possession Prior to Completion (content was: "In addition to the provisions of GP 7.15 (Use and Possession Prior to Completion) the following will apply on Administration Contracts:...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.02 Failure to Adequately Maintain Project (content was: "GP 5.12 (Failure to Maintain Entire Project) is not applicable to Administration Contracts. The provisions of this TC shall apply. If...", and the only contributor was "Bdeane" (talk))
- 12:45, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.01 Working Drawings (content was: "'''(a)''' '''General.''' The Plans shall be supplemented by working drawings as necessary to adequately control the work. All authorize...", and the only contributor was "Bdeane" (talk))
- 12:39, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.04 Safety Hazards in Confined Spaces (content was: " The Contractor shall be responsible for gas detection in and ventilation of confined spaces. When procedures require workers to enter...", and the only contributor was "Bdeane" (talk))
- 12:39, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.03 Rights in and Use of Materials Found on the Project (content was: "The Contractor, with the approval of the Engineer may use on the project any excavated stone, gravel, sand, or other material conforming...", and the only contributor was "Bdeane" (talk))
- 12:38, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.02 Construction Documents to Successful Bidder (content was: "The successful bidder on each Contract advertised by the Administration will be sent upon award of the Contract five sets of Plans, five...", and the only contributor was "Bdeane" (talk))
- 12:28, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.01 Governing Order of Contract Documents (content was: "The Contract Documents, including but not limited to the Standard Specifications, the Special Provisions Inserts, the Plans, Special Prov...", and the only contributor was "Bdeane" (talk))
- 12:27, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.06 Partnering (content was: "The Administration invites the Contractor, subcontractors, and suppliers to participate in a voluntary partnership agreement for the work...", and the only contributor was "Bdeane" (talk))
- 12:25, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.05 Debarment/Suspension (content was: "Pursuant to the emergency regulations which were approved by the Administrative and Executive Legislative Review (AELR) Committee of the...", and the only contributor was "Bdeane" (talk))
- 12:22, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.04 Owner/Operator (content was: "For the purpose of labor compliance, the term "Owner/Operator" will be defined as being the individual who owns and operates their own ve...", and the only contributor was "Bdeane" (talk))
- 12:22, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.03 Value Engineering Change Proposals (content was: "The Contractor may submit to the District Engineer, in writing, Value Engineering Change Proposals (VECP) for modifying the Contract Docu...", and the only contributor was "Bdeane" (talk))
- 12:21, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.02 Preparation of Bid (content was: "The requirements of GP 2.06 (Preparation of Bid) is modified for Administration Contracts to include the following after paragraph (a):...", and the only contributor was "Bdeane" (talk))
- 12:19, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.01 Project Classification (content was: "The Administration will estimate the cost of the Contract and classify it within one cost group and letter designation as follows: :{| b...", and the only contributor was "Bdeane" (talk))
- 12:19, 31 October 2018 Ukelly (talk | contribs) deleted page TC 1.03 Definitions (content was: "'''Additional Work'''—Work not required or provided for in the original Contract. '''Administration'''—The term shall be construed t...", and the only contributor was "Bdeane" (talk))
- 12:18, 31 October 2018 Ukelly (talk | contribs) deleted page TC 1.02 References (content was: "Reference to Specifications or procedures beginning with the letters M, R, or T shall be understood to be AASHTO. Reference to Specifica...", and the only contributor was "Bdeane" (talk))
- 12:18, 31 October 2018 Ukelly (talk | contribs) deleted page TC 1.01 Language (content was: "These specifications incorporate the selective use of the imperative mood. In general, specifications in the imperative mood will imply...", and the only contributor was "Bdeane" (talk))
- 12:17, 31 October 2018 Ukelly (talk | contribs) deleted page TC-4.02 Failure to Adequately Maintain Project (content was: "GP 5.12 (Failure to Maintain Entire Project) is not applicable to Administration Contracts. The provisions of this TC shall apply. If...", and the only contributor was "Bdeane" (talk))
- 12:15, 31 October 2018 Ukelly (talk | contribs) deleted page GP 1.01 - General (content was: "Portions of Part III Technical Requirements of these Standard Specifications for Construction and Materials are written in the Active Voi...", and the only contributor was "Bdeane" (talk))