All public logs

From MDOT Policy Manual
Jump to: navigation, search

Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs      

 

Show patrol log | Show tag log

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 308 EROSION AND SEDIMENT CONTROL (content was: "======'''308.01 DESCRIPTION.'''====== :Apply and maintain erosion and sediment control measures to disturbed areas throughout the life of the project to control erosion and to minimize sedimentation in rivers, streams, lakes, reservoirs...")
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 307 PREFABRICATED EDGE DRAINS (content was: "======'''307.01 DESCRIPTION.'''====== :Construct prefabricated edge drain systems and underdrain pipe outlets. ======'''307.02 MATERIALS.'''====== :{| |Outlet Pipe |      905 |- |Select Borro...")
  • 12:39, 30 October 2018 Ukelly (talk | contribs) deleted page 306 UNDERDRAINS, SUBGRADE DRAINS, AND SPRING CONTROL (content was: "======'''306.01 DESCRIPTION.'''====== :Construct underdrains, subgrade drains, underdrain for spring control, underdrain pipe outlets, and blind drains using pipe, geotextile, and granular material. Clean existing underdrain outlets. =...")
  • 12:38, 30 October 2018 Ukelly (talk | contribs) deleted page 305 MISCELLANEOUS STRUCTURES (content was: "======'''305.01 DESCRIPTION.'''====== :Construct miscellaneous cast in place concrete or masonry drainage structures, furnish and install precast concrete drainage structures, and clean existing drainage structures including but not lim...")
  • 12:38, 30 October 2018 Ukelly (talk | contribs) deleted page 303 PIPE CULVERTS (content was: "======'''303.01 DESCRIPTION.'''====== :Furnish and install pipe culverts, make connections to miscellaneous structures and other pipe culverts, reinstall existing pipes, remove existing pipe culverts, abandon existing pipes, and clean e...")
  • 20:11, 29 October 2018 Ukelly (talk | contribs) deleted page 302 SELECTED BACKFILL (content was: "======'''302.01 DESCRIPTION.'''====== :Place selected backfill material and compact. ======'''302.02 MATERIALS.'''====== :{| |No. 57 Aggregate |      901.01 |- |Crusher Run Aggregate CR...")
  • 20:10, 29 October 2018 Ukelly (talk | contribs) deleted page 106 HOT MIX ASPHALT (HMA) FOR MAINTENANCE OF TRAFFIC (content was: "======'''106.01 DESCRIPTION.'''====== :Place HMA for maintenance of traffic. ======'''106.02 MATERIALS.'''====== :{| |Tack Coat (Rapid Setting) |      904 PERFORMANCE GRADED ASPHALT BINDERS AND ASPH...")
  • 20:06, 24 October 2018 Ukelly (talk | contribs) deleted page 304 STRUCTURAL PLATE PIPE AND STRUCTURAL PLATE PIPE ARCH CULVERTS (content was: "======'''304.01 DESCRIPTION.'''====== :Furnish and install structural plate pipe and structural plate pipe arch culverts. ======'''304.02 MATERIALS.'''====== :{| |No. 57 Aggregate |      901 AGGREGATES|...")
  • 20:05, 24 October 2018 Ukelly (talk | contribs) deleted page 301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION (content was: "======'''301.01 DESCRIPTION.'''====== :Excavate below the specified elevation when unsuitable subgrade material is encountered. ======'''301.02 MATERIALS.'''====== :Not applicable. ======'''301.03 CONSTRUCTION.'''====== :Excavate to...")
  • 19:36, 24 October 2018 Ukelly (talk | contribs) deleted page 211 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE (content was: "======'''211.01 DESCRIPTION.'''====== :Furnish and place a layer of geotextile and 12 in. of graded aggregate base to bridge unstable material and minimize the use of undercutting. Use this item only when specified or directed. In extr...")
  • 19:35, 24 October 2018 Ukelly (talk | contribs) deleted page 210 TAMPED FILL (content was: "======'''210.01 DESCRIPTION.'''====== :Compact the embankment and backfill materials by means of mechanical tampers or vibratory compactors. Use this method of compaction wherever materials cannot be adequately compacted by other appro...")
  • 19:35, 24 October 2018 Ukelly (talk | contribs) deleted page 209 TRIMMING EXISTING DITCHES (content was: "======'''209.01 DESCRIPTION.'''====== :Trim, slope, and shape existing ditches within the limits and to the lines and grades specified. Clearing and grubbing and the removal and disposal of surplus or unsuitable materials are included...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 208 SUBGRADE PREPARATION (content was: "======'''208.01 DESCRIPTION.'''====== :Prepare, protect, and maintain the subgrade prior to the construction of succeeding courses. ======'''208.02 MATERIALS.'''====== :Section 916. ======'''2...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 207 REMOVAL OF EXISTING MASONRY (content was: "======'''207.01 DESCRIPTION.'''====== :Remove all or part of existing concrete, concrete block, brick, or stone structures (headwalls, toe walls, etc.), including concrete piles. Refer to 405 REMOVAL OF EXISTING STRUCTURES|Section 40...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 206 REMOVAL OF EXISTING PAVEMENT, SIDEWALK, PAVED DITCHES, CURB, OR COMBINATION CURB AND GUTTER (content was: "======'''206.01 DESCRIPTION.'''====== :Remove to full depth and dispose of existing pavement, sidewalk, paved ditches, curb, or combination curb and gutter. ======'''206.02 MATERIALS.'''====== :Not applicable. ======'''206.03 CONST...")
  • 19:34, 24 October 2018 Ukelly (talk | contribs) deleted page 205 TEST PIT EXCAVATION (content was: "======'''205.01 DESCRIPTION.'''====== :Excavate and backfill test pits to determine the location of underground structures and utilities. ======'''205.02 MATERIALS.'''====== :Not applicable. ======'''205.03 CONSTRUCTION.'''====== :...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 204 EMBANKMENT AND SUBGRADE (content was: "======'''204.01 DESCRIPTION.'''====== :Construct embankment and subgrade using suitable material obtained from roadway, structure, borrow, and other excavation included in the Contract. Place, process, and compact material to the specifi...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 203 BORROW EXCAVATION (content was: "======'''203.01 DESCRIPTION.'''====== :Furnish, excavate, haul, and place approved materials for embankments and backfills when sufficient quantities of suitable materials are not available from other excavations specified in the Contrac...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 202 CHANNEL OR STREAM CHANGE EXCAVATION (CLASS 5) (content was: "======'''202.01 DESCRIPTION.'''====== :Excavate for changes in channels or streams when specified. Use all suitable material for the construction of the project. Dispose of unsuitable material as directed. ======'''202.02 MATERIALS.''...")
  • 19:33, 24 October 2018 Ukelly (talk | contribs) deleted page 201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) (content was: "======'''201.01 DESCRIPTION.'''====== :Excavate and grade for roadways and appurtenances to the lines and grades specified. :'''201.01.01 Classification.''' ::CLASS 1 — All excavation where the width of the bottom of the cut is...")
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)