  • 16:06, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.12 Land, Air, and Water Pollution (content was: ":'''(a)''' The Contractor shall incorporate all permanent erosion control features into the work at the earliest practicable time as required by the Contract Documents. Temporary pollution control measures will be used to correct condit...")
  • 16:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.11 Preservation and Restoration of Property (content was: ":'''(a)''' The Contractor shall not enter upon public or private property (outside of the right of way or project area) for any purpose without obtaining permission and he shall be responsible for the preservation of all public and priva...")
  • 16:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.10 Maintenance of Traffic (content was: "Unless otherwise noted in the Special Provisions, it shall be the Contractor's responsibility to maintain pedestrian and vehicular traffic safely, adequately and continuously on all portions of existing facilities affected by his work....")
  • 16:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.09 Flagging of Motor Vehicle Traffic (content was: "For all construction Contracts requiring the flagging of motor vehicles licensed for operation on the highways of Maryland, said flagging shall be conducted as specified in the Manual on Uniform Traffic Control Devices for Streets and Hi...")
  • 16:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.08 Barricades and Warning Signs (content was: "The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs and other traffic control devices, and shall take all necessary precautions for the protection of the work a...")
  • 16:04, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.07 Detours (content was: "Detours may be indicated in the Contract Documents, or at the Contractor's request traffic may be detoured over approved routes along existing roads when acceptable to the procurement officer. Detours over existing State roads will be d...")
  • 16:04, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.06 Public Convenience and Safety (content was: "The Contractor at all times shall conduct the work in such a manner as to ensure the least practicable obstruction to all forms of traffic. The convenience of the general public, tenants, and of the residents along and/or adjacent to th...")
  • 16:03, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.05 Construction Safety and Health Standards (content was: "It is a condition of this Contract, and shall be made a condition of each subcontract entered into pursuant to this Contract, that the Contractor and any subcontractor shall not require any laborer or mechanic employed in performance of...")
  • 16:03, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.04 Federal Participation (content was: "When the United States Government pays all or any portion of the cost of a project, the work shall be subject to the inspection of the appropriate federal agency. Such inspection shall in no sense make the federal government a party to...")
  • 16:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.03 Patented Devices, Materials, and Processes (content was: "If the Contractor is required or desires to use any design, device, material, or process covered by letters of patent or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner and a copy of such a...")
  • 16:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.02 Permits and Licenses (content was: ":'''(a)''' The Contractor shall procure at his own expense such permits, licenses, insurance and governmental approval as may be necessary in order to comply with Federal, State and local laws, ordinances and regulations in performance o...")
  • 16:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.01 Compliance with Laws (content was: "The Contractor hereby represents and warrants that: :'''(a)''' It is qualified to do business in the State of Maryland and that it will take such action as, from time to time hereafter, may be necessary to remain so qualified; :'''(b)'...")
  • 15:55, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-9.05 Late Payments (content was: "'''GP-9.05 LATE PAYMENTS''' '''''does not apply; TC-7.07 Late Payments shall apply.''''' :'''(a)''' Payments to the Contractor pursuant to this Contract shall be made no later than 30 days after the State's receipt of a proper invoi...")
  • 15:54, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-9.04 Final Acceptance and Final Payment (content was: "'''GP-9.04 FINAL ACCEPTANCE AND FINAL PAYMENT''' '''''does not apply; TC-7.06 Final Acceptance and Final Payment shall apply.''''' :'''(a)''' When the Contractor has completed a Contract, and it has been accepted for maintenance in...")
  • 15:54, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-9.03 Progress Payments (content was: "'''GP-9.03 PROGRESS PAYMENTS''' '''''does not apply; TC-7.05 Progress Payments shall apply.''''' :'''(a)''' '''Current Estimates.''' ::'''(1)''' '''Lump Sum Contracts.''' If requested by the Administration, the Contractor shall fu...")
  • 15:53, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-9.02 Force Account Work (content was: "'''GP-9.02 FORCE ACCOUNT WORK''' '''''does not apply; TC-7.03 Force Account shall apply.''''' :When the Contractor is required to perform work as a result of additions or changes to the Contract for which...")
  • 15:53, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-9.01 Scope of Payment (content was: "'''GP-9.01 SCOPE OF PAYMENT''' '''''does not apply; TC-7.04 Scope of Payment shall apply.''''' :Payment to the Contractor will be made for the actual quantities of Contract items performed in accordance with the Plans and Specificat...")
  • 15:51, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.11 Successful Termination of Contractor's Responsibility (content was: ":A Contract will be considered as successfully fulfilled when the work has been completed in accordance with the terms of the Contract; when final acceptance has occurred; when final payment has been authorized; when all of the obligatio...")
  • 15:50, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.10 Termination for Convenience of the State (content was: ":'''(a)''' The performance of work under this Contract may be terminated by the State in accordance with this clause in whole, or from time to time in part, whenever the procurement officer shall determine that such termination is in the...")
  • 15:50, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.09 Liquidated Damages (content was: ":Time is an essential element of the Contract and it is important that the work be vigorously prosecuted until completion. :For each day that any work shall remain uncompleted beyond the time specified elsewhere in the Contract, the Con...")