All public logs

From MDOT Policy Manual
Jump to: navigation, search

Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs      

 

Show patrol log | Show tag log

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)
  • 15:49, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.08 Termination for Default-Damages for Delay-Time Extensions (content was: ":'''(a)''' If the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as shall insure its completion within the time specified in this Contract, or any extension thereof, or fails to comp...")
  • 15:49, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.07 Suspension of Work (content was: "'''''On Administration Contracts, in addition to GP 8.07 Suspension of Work, TC 4.04 Suspension of Work shall apply.''''' :'''(a)''' The procurement officer unilaterally may order the Contractor in writing...")
  • 15:49, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.06 Character of Workmen, Methods, and Equipment (content was: ":The Contractor shall employ sufficient labor and equipment for prosecuting the several classes of work to full completion in the manner and time required by the Contract. :Workmen must have sufficient skill and experience to perform pr...")
  • 15:48, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.05 Limitations of Operation (content was: ":The Contractor shall conduct the work at all times in such a manner and in such sequence as will assure the least interference with the public. Category: 2016 Standard Specifications For Construction And Materials")
  • 15:48, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.04 Progress Schedule (content was: ":'''(a)''' Within 30 days after Notice to Proceed, the Contractor shall furnish the procurement officer a "Progress Schedule" showing the proposed order of work and indicating the time required for the completion of the work. Said progr...")
  • 15:48, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.03 Prosecution of the Work (content was: ":'''(a)''' The Contractor shall begin work promptly within the time specified by the procurement officer and shall notify the procurement officer at least 48 hours before starting work. :'''(b)''' After the work has once been started, i...")
  • 15:47, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.02 Notice to Proceed (content was: "'''''On Administration Contracts in addition to GP-8.02 Notice To Proceed, TC-5.02 Notice to Proceed and Project Schedule shall apply.''''' :After the Contract has been executed, the Administration will, within the time limit specif...")
  • 15:47, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-8.01 Subcontracting (content was: "'''''On Administration Contracts in addition to the provisions of GP-8.01 Subcontracting, TC-5.03 Subcontracting and Subcontractors shall apply.''''' :Except as may be provided elsewhere in the Contract, the Contractor to whom a Con...")
  • 15:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.36 Retention of Records (content was: ":'''(a)''' The Contractor shall retain and maintain all records and documents, including, but not limited to, cost or pricing data, relating to this Contract for three years after final payment by the State hereunder or any applicable st...")
  • 15:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.35 Pre-Existing Regulations (content was: ":In accordance with the provisions of [http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?article=gsf&section=11-206&ext=html&session=2015RS&tab=subject5 Section 11-206] of the State Finance and Procurement Article, Annotated Code of...")
  • 15:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.34 Conflict of Interest Law (content was: ":It is unlawful for any State officer, employee, or agent to participate personally in his official capacity through decision, approval, disapproval, recommendation, advice, or investigation in any Contract or other matter in which he, h...")
  • 15:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.33 Political Contribution Disclosure (content was: ":The Contractor shall comply with the provisions of the Election Law Article, §§ [http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?article=gel&section=14-101&ext=html&session=2015RS&tab=subject5 14-101] et. Seq. of the Annotated...")
  • 15:40, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.32 Financial Disclosure (content was: ":The Contractor shall comply with the provisions of [http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?article=gsf&section=13-221&ext=html&session=2015RS&tab=subject5 Section 13-221] of the State Finance and Procurement Article of t...")
  • 15:40, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.31 Small Business Procurements (content was: ":If the solicitation for bid indicates that this procurement has been designated for small business preferences, the appropriate provisions of [http://www.dsd.state.md.us/COMAR/SubtitleSearch.aspx?search=21.11.01.* COMAR 21.11.01] pertai...")
  • 15:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.30 Prevailing Wage Contracts for Public Works (content was: ":'''(a)''' The Provisions of Subtitle 2 of Title 17 of the State Finance and Procurement article of the Annotated Code of Maryland and [http://www.dsd.state.md.us/COMAR/SubtitleSearch.aspx?search=21.11.11.* COMAR 21.11.11] pertaining to...")
  • 15:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.29 Minority Business Enterprise and Affirmative Action (content was: ":'''(a)''' This Contract is subject to Executive Order 01.01.170.15, December 9, 1970; amended by Order 01.01.1976.05, July 9, 1976 (Code of Fair Practices), and [http://www.dsd.state.md.us/COMAR/SubtitleSearch.aspx?search=21.11.04.* COM...")
  • 15:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.28 Buy American Steel Act (content was: ": The Provisions of [http://www.dsd.state.md.us/COMAR/SubtitleSearch.aspx?search=21.11.02.* COMAR 21.11.02] pertaining to implementation of the "Buy American Steel" Act (Subtitle 3 of Title 17 of the State Finance and Procurement Article...")
  • 15:38, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.27 Corporate Registration and Tax Payment Certification (content was: ":Corporations are required to execute a certification of corporation registration and tax payment in the form included in the Contract Documents. Category: 2016 Standard Specifications For Construction And Materials")
  • 15:36, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.26 Cost and Price Certification (content was: ":'''(a)''' The Contractor by submitting cost or price information certifies that, to the best of its knowledge, the information submitted is accurate, complete, and current as of a mutually determined specified date prior to the conclusi...")
  • 15:35, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.25 Multi-Year Contracts Contingent Upon Appropriations (content was: ":If the General Assembly fails to appropriate funds or if funds are not otherwise made available for continued performance for any fiscal period of this Contract succeeding the first fiscal period, this Contract shall be canceled automat...")
  • 15:35, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.24 Contingent Fee Prohibition (content was: ":'''(a)''' The Contractor warrants that it has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee or agent working for the Contractor, to solicit or secure this Contract, and t...")
  • 15:35, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.23 Choice of Law (content was: ":The Parties hereby agree that: :'''(a)''' This Contract was made and entered into in Maryland, and under the laws of Maryland. :'''(b)''' The law of Maryland shall govern the resolution of any issue arising in connection with this Con...")
  • 15:35, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.22 Nonhiring of Employees (content was: ":No official or employee of the State of Maryland,or any unit thereof, as defined under State Government Article, § 15-102 of the Annotated Code of Maryland, whose duties as such official or employee include matters relating to or affec...")
  • 15:34, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.21 Sanctions Upon Improper Acts (content was: ":In the event the Contractor, or any of its officers, partners, principals or employees, is convicted of a crime arising out of, or in connection with, the procurement of work to be done or payment to be made under this Contract, the Con...")
  • 15:33, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.20 Nondiscrimination in Employment (content was: ":'''(a)''' Compliance with State Law and Regulations ::'''(1)''' State Law ::The Contractor agrees: :::'''(a)''' Not to discriminate in any manner against an employee or applicant for employment because of race, color, religion, cre...")
  • 15:33, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.19 No Waiver of Legal Rights (content was: ":The Administration shall not be precluded or estopped by any measurement, estimate, or certificate made either before or after the completion and acceptance of the work and payment therefore, from showing the true amount and character o...")
  • 15:32, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.18 Personal Liability of Public Officials (content was: ":In carrying out any of the provisions of the Contract, or in exercising any power or authority granted to them by or within the scope of the Contract, there shall be no liability upon the Administrator, procurement officer or other auth...")
  • 15:32, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.17 Contractor's Responsibility for Utility Property and Services (content was: ":At points where the Contractor's operations are adjacent to properties of railway, telegraph, telephone, and power companies, or are adjacent to other property, damage to which might result in expense, loss or inconvenience, work shall...")
  • 15:32, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.16 Contractor's Responsibility for Work (content was: ":'''(a)''' Except as herein elsewhere provided, until final acceptance of the work by the Administration, the Contractor shall have the charge and care thereof and shall take every reasonable precaution against injury or damage to any pa...")
  • 15:31, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.15 Use and Possession Prior to Completion (content was: "'''''On Administration Contracts in addition to GP-7.15 Use and Possession Prior to Completion, TC-4.03 Use and Possession Prior to Completion shall apply.''''' :The Administration shall have the right to take possession of or use a...")
  • 15:31, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.14 Liability Insurance (content was: "'''''On Administration Contracts, in addition to GP-7.14 Liability Insurance, TC-5.01 Insurance shall apply.''''' :Prior to the start of work on this Contract, the Contractor shall submit to the procurement officer a certificate of...")
  • 15:30, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.13 Responsibility for Damage Claims (content was: ":'''(a)''' The Contractor shall indemnify and save harmless, and shall require that each subcontractor shall indemnify and save harmless the State and all of its representatives from all suits, actions, or claims of any character brought...")
  • 15:28, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.12 Land, Air, and Water Pollution (content was: ":'''(a)''' The Contractor shall incorporate all permanent erosion control features into the work at the earliest practicable time as required by the Contract Documents. Temporary pollution control measures will be used to correct condit...")
  • 15:28, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.11 Preservation and Restoration of Property (content was: ":'''(a)''' The Contractor shall not enter upon public or private property (outside of the right of way or project area) for any purpose without obtaining permission and he shall be responsible for the preservation of all public and priva...")
  • 15:25, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.10 Maintenance of Traffic (content was: ":Unless otherwise noted in the Special Provisions, it shall be the Contractor's responsibility to maintain pedestrian and vehicular traffic safely, adequately and continuously on all portions of existing facilities affected by his work....")
  • 15:25, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.09 Flagging of Motor Vehicle Traffic (content was: ":For all construction Contracts requiring the flagging of motor vehicles licensed for operation on the highways of Maryland, said flagging shall be conducted as specified in the Manual on Uniform Traffic Control Devices for Streets and H...")
  • 15:25, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.08 Barricades and Warning Signs (content was: ":The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs and other traffic control devices, and shall take all necessary precautions for the protection of the work...")
  • 15:25, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.07 Detours (content was: ":Detours may be indicated in the Contract Documents, or at the Contractor's request traffic may be detoured over approved routes along existing roads when acceptable to the procurement officer. Detours over existing State roads will be...")
  • 15:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.06 Public Convenience and Safety (content was: ":The Contractor at all times shall conduct the work in such a manner as to ensure the least practicable obstruction to all forms of traffic. The convenience of the general public, tenants, and of the residents along and/or adjacent to t...")
  • 15:23, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.05 Construction Safety and Health Standards (content was: ":It is a condition of this Contract, and shall be made a condition of each subcontract entered into pursuant to this Contract, that the Contractor and any subcontractor shall not require any laborer or mechanic employed in performance of...")
  • 15:23, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.04 Federal Participation (content was: ":When the United States Government pays all or any portion of the cost of a project, the work shall be subject to the inspection of the appropriate federal agency. Such inspection shall in no sense make the federal government a party to...")
  • 15:23, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.03 Patented Devices, Materials, and Processes (content was: ":If the Contractor is required or desires to use any design, device, material, or process covered by letters of patent or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner and a copy of such...")
  • 15:22, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.02 Permits and Licenses (content was: ":'''(a)''' The Contractor shall procure at his own expense such permits, licenses, insurance and governmental approval as may be necessary in order to comply with Federal, State and local laws, ordinances and regulations in performance o...")
  • 15:22, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-7.01 Compliance with Laws (content was: ":The Contractor hereby represents and warrants that: :'''(a)''' It is qualified to do business in the State of Maryland and that it will take such action as, from time to time hereafter, may be necessary to remain so qualified; :'''(b)...")
  • 14:15, 16 February 2017 User account Sherlyn87M (talk | contribs) was created
  • 13:57, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.04 Administration Furnished Material (content was: "The Contractor shall furnish all materials required to complete the work, except those specified to be furnished by the Administration....", and the only contributor was "Bdeane" (talk))
  • 13:57, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.03 Unacceptable Materials (content was: ":'''(a)''' Materials represented by samples taken and tested in accordance with the specified tests and failing to meet required values shall be considered to be defective regardless of prior tests or approvals. :'''(b)''' Unless otherw...")
  • 13:57, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.02 Storage and Handling of Materials (content was: "Materials shall be so stored as to assure the preservation of their quality and acceptability for the work. Stored materials, even thoug...", and the only contributor was "Bdeane" (talk))
  • 13:57, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.01 General (content was: "All materials shall meet all quality requirements of the Contract. In order to expedite the inspection and testing of the materials, the...", and the only contributor was "Bdeane" (talk))
  • 13:56, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.04 Administration Furnished Material (content was: ":The Contractor shall furnish all materials required to complete the work, except those specified to be furnished by the Administration. Materials furnished by the Administration will be delivered or made available to the Contractor at...")
  • 13:56, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.03 Unacceptable Materials (content was: ":'''(a)''' Materials represented by samples taken and tested in accordance with the specified tests and failing to meet required values shall be considered to be defective regardless of prior tests or approvals. :'''(b)''' Unless otherw...")
  • 13:56, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.02 Storage and Handling of Materials (content was: ":Materials shall be so stored as to assure the preservation of their quality and acceptability for the work. Stored materials, even though approved before storage, may again be inspected prior to their use in the work. Stored materials...")
  • 13:55, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.01 General (content was: ":All materials shall meet all quality requirements of the Contract. In order to expedite the inspection and testing of the materials, the Contractor shall notify the procurement officer in writing of the sources from which he proposes t...")
  • 13:49, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.13 Acceptance for Maintenance (content was: ":'''(a)''' '''Partial Acceptance for Maintenance.''' If at any time during the performance of the work the Contractor substantially completes a unit or portion of the work, he may request the procurement officer to make final inspection...")
  • 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.14 Filing of Claim by Contractor (content was: "Unless a shorter period is prescribed by law or elsewhere in this Contract, :'''(a)''' The Contractor shall file a written notice of claim for extension of time, equitable adjustment, extra compensation, damages, or any other matter (wh...")
  • 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.15 Disputes (content was: ":'''(a)''' This Contract is subject to the provisions of Title 15, Subtitle 2, State Finance and Procurement Article (Dispute Resolution) of the Annotated Code of Maryland and COMAR 21.10 (Administrative and Civil Remedies). :'''(b)'''...")
  • 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.12 Failure to Maintain Entire Project (content was: "'''''On Administration Contracts GP 5.12 Failure to Maintain Entire Project does not apply; TC 4.02 shall apply.''''' Failure on the par...", and the only contributor was "Bdeane" (talk))
  • 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.11 Maintenance of Work During Construction (content was: ":'''(a)''' The Contractor shall maintain the work during construction and until acceptance. This maintenance shall constitute continuous and effective work prosecuted as required with adequate equipment and forces to the end that all pa...")
  • 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.10 Load Restrictions (content was: ":'''(a)''' The Contractor shall comply with all State and local requirements pertaining to speed, size and weight of motor vehicles. :'''(b)''' The Administration may indicate in the Contract load restrictions on any road or structure w...")
  • 13:47, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.09 Removal of Defective Work (content was: "All work and materials which do not conform to the requirement of the Contract will be considered unacceptable, unless otherwise determin...", and the only contributor was "Bdeane" (talk))
  • 13:47, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.08 Inspection of Work (content was: "All materials and each part or detail of the work shall be subject at all times to inspection by the procurement officer or his authorize...", and the only contributor was "Bdeane" (talk))
  • 13:47, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.07 Authority and Duties Of Inspectors (content was: "Inspectors shall be authorized to inspect all work done and all material furnished. Such inspection may extend to all or any part of the...", and the only contributor was "Bdeane" (talk))
  • 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.06 Cooperation Between Contractors (content was: ":'''(a)''' Separate Contractors on adjoining or overlapping work shall cooperate with each other as necessary. Such cooperation shall include: :# Arrangement and conduct of work; :# Storage and disposal of materials, etc., by each in s...")
  • 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.05 Cooperation with Utilities (content was: "It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in the...", and the only contributor was "Bdeane" (talk))
  • 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.04 Cooperation by Contractor (content was: "The Contractor will keep available on the project site at all times one complete set of Contract Documents. The Contractor shall give th...", and the only contributor was "Bdeane" (talk))
  • 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.03 Discrepancies in the Contract Documents (content was: "In the event the Contractor discovers any discrepancies in the Contract Documents, he shall immediately notify the procurement officer....", and the only contributor was "Bdeane" (talk))
  • 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.02 Conformity with Contract Requirements (content was: "All work performed and all materials furnished shall be in conformity with the Contract requirements. In the event the procurement offic...", and the only contributor was "Bdeane" (talk))
  • 13:44, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.01 Authority of the Procurement Officer (content was: ":'''(a)''' The procurement officer shall decide all questions which may arise as to the quality and acceptability of materials furnished and work performed and as to the rate of progress of said work; all questions which may arise as to...")
  • 13:43, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.15 Disputes (content was: ":'''(a)''' This Contract is subject to the provisions of Title 15, Subtitle 2, State Finance and Procurement Article (Dispute Resolution) of the Annotated Code of Maryland and COMAR 21.10 (Administrative and Civil Remedies). :'''(b)'''...")
  • 13:43, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.14 Filing of Claim by Contractor (content was: ":Unless a shorter period is prescribed by law or elsewhere in this Contract, :'''(a)''' The Contractor shall file a written notice of claim for extension of time, equitable adjustment, extra compensation, damages, or any other matter (w...")
  • 13:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.13 Acceptance for Maintenance (content was: ":'''(a)''' '''Partial Acceptance for Maintenance.''' If at any time during the performance of the work the Contractor substantially completes a unit or portion of the work, he may request the procurement officer to make final inspection...")
  • 13:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.12 Failure to Maintain Entire Project (content was: "'''''On Administration Contracts GP-5.12 Failure to Maintain Entire Project does not apply; TC-4.02 shall apply.''''' :Failure on the part of the Contractor, at any time, to comply with the provis...")
  • 13:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.11 Maintenance of Work During Construction (content was: ":'''(a)''' The Contractor shall maintain the work during construction and until acceptance. This maintenance shall constitute continuous and effective work prosecuted as required with adequate equipment and forces to the end that all pa...")
  • 13:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.10 Load Restrictions (content was: ":'''(a)''' The Contractor shall comply with all State and local requirements pertaining to speed, size and weight of motor vehicles. :'''(b)''' The Administration may indicate in the Contract load restrictions on any road or structure w...")
  • 13:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.09 Removal of Defective Work (content was: ":All work and materials which do not conform to the requirement of the Contract will be considered unacceptable, unless otherwise determined acceptable under the provisions in GP-5.02. :...")
  • 13:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.08 Inspection of Work (content was: ":All materials and each part or detail of the work shall be subject at all times to inspection by the procurement officer or his authorized representative, and the Contractor will be held strictly to the materials, workmanship, and the d...")
  • 13:40, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.07 Authority and Duties Of Inspectors (content was: ":Inspectors shall be authorized to inspect all work done and all material furnished. Such inspection may extend to all or any part of th...", and the only contributor was "Bdeane" (talk))
  • 13:40, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.06 Cooperation Between Contractors (content was: ":'''(a)''' Separate Contractors on adjoining or overlapping work shall cooperate with each other as necessary. Such cooperation shall include: ::'''(1)''' Arrangement and conduct of work; ::'''(2)''' Storage and disposal of materials,...")
  • 13:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.05 Cooperation with Utilities (content was: ":It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in their present or relocated positions and that no additional compensation will be allowed for delays, i...")
  • 13:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.04 Cooperation by Contractor (content was: ":The Contractor will keep available on the project site at all times one complete set of Contract Documents. :The Contractor shall give the work the constant attention necessary to facilitate the progress thereof, and shall cooperate wi...")
  • 13:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.03 Discrepancies in the Contract Documents (content was: ":In the event the Contractor discovers any discrepancies in the Contract Documents, he shall immediately notify the procurement officer. The procurement officer will then make such corrections and interpretations as may be deemed necess...")
  • 13:38, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.02 Conformity with Contract Requirements (content was: ":All work performed and all materials furnished shall be in conformity with the Contract requirements. :In the event the procurement officer finds the materials or the finished product in which the materials are used or the work perform...")
  • 13:38, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.01 Authority of the Procurement Officer (content was: ":'''(a)''' The procurement officer shall decide all questions which may arise as to the quality and acceptability of materials furnished and work performed and as to the rate of progress of said work; all questions which may arise as to...")
  • 13:31, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.10 Warranty of Construction (content was: "'''''On Administration Contracts GP-4.10 Warranty of Construction does not apply unless otherwise specified in the Contract Documents.''''' :'''(a)''' In addition to any other warranties at law or set out elsewhere in this Contract, the...")
  • 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.09 Final Clean Up (content was: "Upon completion of the work specified in the Contract and before final payment will be made, the construction area and all other adjoinin...", and the only contributor was "Bdeane" (talk))
  • 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.08 Unauthorized Work (content was: "Work done contrary to or regardless of the instructions of the procurement officer; work done beyond the lines and grades shown on the Co...", and the only contributor was "Bdeane" (talk))
  • 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.07 Negotiated Payment Provision (content was: "If the Contractor is entitled to an equitable adjustment, the Contractor shall be allowed to add the following maximum percentages for overhead and profit to his costs for labor and materials: :'''(a)''' Twenty percent may be added by...")
  • 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.06 Changes (content was: ":'''(a)''' The procurement officer may unilaterally, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make any change in the work within the general scope of the Contract...")
  • 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.05 Differing Site Conditions (content was: ":'''(a)''' The Contractor shall promptly, and before such conditions are disturbed, notify the procurement officer in writing of: :# Subsurface or latent physical conditions at the site differing materially from those indicated in this...")
  • 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.04 Variations in Estimated Quantities (content was: "'''''On Administration Contracts, in addition to GP-4.04 Variations in Estimated Quantities, TC-7.08 Estimated Items shall apply.''''' W...", and the only contributor was "Bdeane" (talk))
  • 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.03 Entire Contract (content was: "The Contract Documents represent the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, re...", and the only contributor was "Bdeane" (talk))
  • 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.02 General Provisions Controlling (content was: "In the event of a conflict between these General Provisions and any other provision of the Contract Documents, these General Provisions s...", and the only contributor was "Bdeane" (talk))
  • 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.01 Intent of Contract (content was: ":'''(a)''' The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections, dimensions, and other data shown on the Plans or as modified by written orders including the fur...")
  • 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.10 Warranty of Construction (content was: "'''''On Administration Contracts GP-4.10 Warranty of Construction does not apply unless otherwise specified in the Contract Documents.''''' :'''(a)''' In addition to any other warranties at law or set out elsewhere in this Contract, the...")
  • 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.09 Final Clean Up (content was: ":Upon completion of the work specified in the Contract and before final payment will be made, the construction area and all other adjoining areas, other than those owned by him, occupied by the Contractor during the construction of said...")
  • 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.08 Unauthorized Work (content was: ":Work done contrary to or regardless of the instructions of the procurement officer; work done beyond the lines and grades shown on the Contract Drawings, or as given; or any extra work done without written authority will be considered a...")
  • 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.07 Negotiated Payment Provision (content was: ":If the Contractor is entitled to an equitable adjustment, the Contractor shall be allowed to add the following maximum percentages for o...", and the only contributor was "Bdeane" (talk))
  • 13:26, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.06 Changes (content was: ":'''(a)''' The procurement officer may unilaterally, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make any change in the work within the general scope of the Contract...")
  • 13:25, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.01 Intent of Contract (content was: ":'''(a)''' The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections, dimensions, and other data shown on the Plans or as modified by written orders including the fur...")
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.02 General Provisions Controlling (content was: ":In the event of a conflict between these General Provisions and any other provision of the Contract Documents, these General Provisions shall prevail unless such other provision expressly provides to the contrary. Category: 2016 Stand...")
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.03 Entire Contract (content was: ":The Contract Documents represent the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, representations or agreements either written or oral. Category: 2016 Standard Specifications For Co...")
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.04 Variations in Estimated Quantities (content was: "'''''On Administration Contracts, in addition to GP-4.04 Variations in Estimated Quantities, TC-7.08 Eliminated Items shall apply.''''' :Where the quantity of a pay item in this Contract is an estimated quantity and where the actual...")
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.05 Differing Site Conditions (content was: ":'''(a)''' The Contractor shall promptly, and before such conditions are disturbed, notify the procurement officer in writing of: ::'''(1)''' Subsurface or latent physical conditions at the site differing materially from those indicated...")
  • 15:07, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.22 Multiple or Alternate Bids (content was: "Unless multiple or alternate bids are requested in the solicitation, these bids may not be accepted. However, if a bidder clearly indica...", and the only contributor was "Bdeane" (talk))
  • 15:07, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.23 Bid Protests (content was: "A bid protest must be in writing and filed with the procurement officer. Oral objections, whether or not acted on, are not protests. :'''(a)''' '''Time for Filing.''' :# A bid protest shall be filed not later than 7 days after the bas...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.21 Resident Business Preference (content was: ":'''(a)''' When awarding a Contract by competitive sealed bidding, if the State in which a nonresident firm submitting the lowest responsible bid is located gives a competitive advantage to its resident businesses, a procurement agency m...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.20 Tie Bids (content was: "'''''On Administration Federal Aid Contracts, the preference to in State Contractors does not apply.''''' :'''(a)''' '''Definition.''' Tie bids are responsive bids from responsible bidders that are identical in price, terms and conditi...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.19 Bid Evaluation and Award (content was: ":'''(a)''' '''General.''' The Contract is to be awarded to the responsible and responsive bidder whose bid meets the requirements and evaluation criteria set forth in the Invitation for Bids, and is either the lowest bid price or lowest...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.18 Rejection of All Bids (content was: ":'''(a)''' After opening of bids or proposals but before award, all bids or proposals may be rejected in whole or in part when the procurement officer, with the approval of the agency head or his designee, determines that this action is...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.17 Rejection of Individual Bids or Proposals (content was: ":'''(a)''' Any bid may be rejected in whole or in part when it is in the best interest of the State to do so. :'''(b)''' Reasons for rejection of a bid may include but are not limited to: :# The bid is not responsive i.e., it does not...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.16 Cancellation of Invitations for Bids (content was: ":'''(a)''' Before opening of bids a solicitation may be canceled in whole or in part when the State determines this action is fiscally advantageous or otherwise in its best interest. :'''(b)''' When a solicitation is canceled before bid...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.15 Minor Irregularities or Informalities (content was: ":'''(a)''' '''General.''' Minor irregularities or informalities in bids, as defined below, may be waived if the procurement officer determines that it shall be in the State's best interest. The procurement officer may either give a bid...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.14 Mistakes in Bids (content was: ":'''(a)''' '''Mistakes Discovered Before Opening.''' A bidder may correct mistakes discovered before the time and date set for bid opening by withdrawing or correcting the bid as provided in GP 2.11. :'''(b)''' '''Confirmation of Bid.'...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.13 Opening and Recording of Bids (content was: ":'''(a)''' '''Opening and Recording.''' Bids and modifications shall be opened publicly, at the time, date, and place designated in the Invitation for Bids. The name of each bidder, the bid price, and such other information as is deeme...")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.12 Late Bids, Late Withdrawals, and Late Modification (content was: ":'''(a)''' '''Policy.''' Any bid received at the place designated in the solicitation after the time and date set for receipt of bids is late. Any request for withdrawal or request for modification received after the time and date set...")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.11 Pre-Opening Modification or Withdrawal Of Bids (content was: ":'''(a)''' '''Procedure.''' Bids may be modified or withdrawn by written notice delivered to and received in the office designated in the Invitation for Bids before the time and date set for bid opening. Written notice of modification...")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.10 Amendments to Invitations for Bids (content was: ":'''(a)''' '''Form.''' Each amendment to an Invitation for Bids shall be in writing and identified as such. :'''(b)''' '''Acknowledgements.''' Unless otherwise provided, the bidder shall acknowledge receipt of all amendments.")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.09 Communications and Interpretations-Prior to Bid Opening (content was: "Any information regarding the requirements or the interpretation of any provision of the General Provisions, Special General Provisions,...", and the only contributor was "Bdeane" (talk))
  • 15:03, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.08 Delivery of Bids (content was: "Each bid must be submitted in a sealed envelope plainly marked to indicate its contents. When sent by mail, the sealed bid must be addre...", and the only contributor was "Bdeane" (talk))
  • 15:03, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.07 Proposal Guaranty (content was: ":'''(a)''' No bid will be considered for any Contract in excess of $100,000 unless accompanied by a guaranty in an amount not less than 5 percent of the amount bid, or such amount as may be specified elsewhere in the bid documents and ma...")
  • 15:02, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.06 Preparation of Bid (content was: "'''''On Administration Contracts the Contractor may elect to submit his bid on forms generated in the development of his bid as specified in TC 2.02 Preparation of Bid.''''' :'''(a)''' The bidder shall submit his bid upon the blank form...")
  • 15:02, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.05 Taxes-Responsibility for Payment, Exemptions, Forms to File, Etc. (content was: ":'''(a)''' The Contractor is responsible for, and by submitting a bid agrees to pay, all retail sales, income, real estate, sales and use, transportation and special taxes applicable to and assessable against any materials, equipment, pr...")
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.04 Site Investigation (content was: "The Contractor acknowledges that he has investigated and satisfied himself as to the conditions affecting the work, including but not res...", and the only contributor was "Bdeane" (talk))
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.04 Owner/Operator (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.03 Value Engineering Change Proposals (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.03 Interpretation of Quantities in Bid Schedule (content was: "Where designated as estimated quantities, the quantities in the prepared bid schedule are approximate only. Payment to the Contractor wi...", and the only contributor was "Bdeane" (talk))
  • 15:00, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.02 Preparation of Bid (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 15:00, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.02 Contents of Bid Forms (content was: "All papers included in, bound thereto or attached to the bid form are necessary parts thereof and shall not be detached, separated or alt...", and the only contributor was "Bdeane" (talk))
  • 15:00, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.01 Project Classification (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.05 Failure to Execute Contract (content was: ":Failure of the bidder to execute the Contract and file acceptable security as defined in GP-3.03 within the time aforesaid shall be just cause for the annulment of the award and...")
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.04 Execution of Contract (content was: ":'''(a)''' The Contract shall be effective only upon receipt by the Administration of the proper, executed Contract form, and performance and payment bonds (if required), approval by the Board of Public Works, (if required), and executio...")
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.03 Performance Bond and Payment Bond Requirements (content was: ":'''(a)''' Acceptable security for performance and payment shall be as stated in [http://www.dsd.state.md.us/comar/comarhtml/21/21.06.07.01.htm COMAR 21.06.07.01B]. :'''(b)''' '''Performance and Payment Bonds.''' A performance and paym...")
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.02 Return of Proposal Guaranty (content was: ":All proposal guaranties, except those of the three lowest bidders, will be returned immediately following opening and the review of the proposals. The guaranty of the three lowest bidders will be returned following the execution of the...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.01 Award of Contract (See GP-2.19) (content was: ":Written notice of award shall be sent to the successful bidder. A Notice of Award may be rescinded at any time prior to execution of the Contract by the Administrator. Category: 2016 Standard Specifications For Construction And Mater...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.23 Bid Protests (content was: ":A bid protest must be in writing and filed with the procurement officer. Oral objections, whether or not acted on, are not protests. ::'''(a)''' '''Time for Filing.''' :::'''(1)''' A bid protest shall be filed not later than 7 days a...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.22 Multiple or Alternate Bids (content was: ":Unless multiple or alternate bids are requested in the solicitation, these bids may not be accepted. However, if a bidder clearly indicates a base bid, it shall be considered for award as though it were the only bid submitted by the bi...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.21 Resident Business Preference (content was: ":'''(a)''' When awarding a Contract by competitive sealed bidding, if the State in which a nonresident firm submitting the lowest responsible bid is located gives a competitive advantage to its resident businesses, a procurement agency m...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.20 Tie Bids (content was: "'''''On Administration Federal Aid Contracts, the preference to in-State Contractors does not apply.''''' :'''(a)''' '''Definition.''' Tie bids are responsive bids from responsible bidders that are identical in price, terms and conditi...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.19 Bid Evaluation and Award (content was: ":'''(a)''' '''General.''' The Contract is to be awarded to the responsible and responsive bidder whose bid meets the requirements and evaluation criteria set forth in the Invitation for Bids, and is either the lowest bid price or lowest...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.18 Rejection of All Bids (content was: ":'''(a)''' After opening of bids or proposals but before award, all bids or proposals may be rejected in whole or in part when the procurement officer, with the approval of the agency head or his designee, determines that this action is...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.17 Rejection of Individual Bids or Proposals (content was: ":'''(a)''' Any bid may be rejected in whole or in part when it is in the best interest of the State to do so. :'''(b)''' Reasons for rejection of a bid may include but are not limited to: ::'''(1)''' The bid is not responsive i.e., it...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.16 Cancellation of Invitations for Bids (content was: ":'''(a)''' Before opening of bids a solicitation may be canceled in whole or in part when the State determines this action is fiscally advantageous or otherwise in its best interest. :'''(b)''' When a solicitation is canceled before bid...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.15 Minor Irregularities or Informalities (content was: ":'''General.''' Minor irregularities or informalities in bids, as defined below, may be waived if the procurement officer determines that it shall be in the State's best interest. The procurement officer may either give a bidder an opp...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.14 Mistakes in Bids (content was: ":'''(a)''' '''Mistakes Discovered Before Opening.''' A bidder may correct mistakes discovered before the time and date set for bid opening by withdrawing or correcting the bid as provided in GP-2.11 Pre-Opening Modification or Withdra...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.13 Opening and Recording of Bids (content was: ":'''(a)''' '''Opening and Recording.''' Bids and modifications shall be opened publicly, at the time, date, and place designated in the Invitation for Bids. The name of each bidder, the bid price, and such other information as is deeme...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.12 Late Bids, Late Withdrawals, and Late Modification (content was: ":'''(a)''' '''Policy.''' Any bid received at the place designated in the solicitation after the time and date set for receipt of bids is late. Any request for withdrawal or request for modification received after the time and date set...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.11 Pre-Opening Modification or Withdrawal of Bids (content was: ":'''(a)''' '''Procedure.''' Bids may be modified or withdrawn by written notice delivered to and received in the office designated in the Invitation for Bids before the time and date set for bid opening. Written notice of modification...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.11 Pre-Opening Modification or Withdrawal Of Bids (content was: ":'''(a)''' '''Procedure.''' Bids may be modified or withdrawn by written notice delivered to and received in the office designated in th...", and the only contributor was "Bdeane" (talk))
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.10 Amendments to Invitations for Bids (content was: ":'''(a)''' '''Form.''' Each amendment to an Invitation for Bids shall be in writing and identified as such. :'''(b)''' '''Acknowledgements.''' Unless otherwise provided, the bidder shall acknowledge receipt of all amendments. Catego...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.09 Communications and Interpretations Prior to Bid Opening (content was: ":Any information regarding the requirements or the interpretation of any provision of the General Provisions, Special General Provisions, Specifications or any part of the bidding documents shall be requested, in writing, from the procur...")
  • 14:53, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.09 Communications and Interpretations-Prior to Bid Opening (content was: "Any information regarding the requirements or the interpretation of any provision of the General Provisions, Special General Provisions,...", and the only contributor was "Bdeane" (talk))
  • 14:52, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.08 Delivery of Bids (content was: ":Each bid must be submitted in a sealed envelope plainly marked to indicate its contents. When sent by mail, the sealed bid must be addressed to the Administration at the address and in care of the official in whose office the bids are...")
  • 14:52, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.07 Proposal Guaranty (content was: ":'''(a)''' No bid will be considered for any Contract in excess of $100,000 unless accompanied by a guaranty in an amount not less than 5 percent of the amount bid, or such amount as may be specified elsewhere in the bid documents and ma...")
  • 14:52, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.06 Preparation of Bid (content was: "'''''On Administration Contracts the Contractor may elect to submit his bid on forms generated in the development of his bid as specified in TC-2.02 Preparation of Bid.''''' :'''(a)''' The bidder shall submit his bid upon the blank...")
  • 14:52, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.05 Taxes-Responsibility for Payment, Exemptions, Forms to File, Etc. (content was: ":'''(a)''' The Contractor is responsible for, and by submitting a bid agrees to pay, all retail sales, income, real estate, sales and use, transportation and special taxes applicable to and assessable against any materials, equipment, pr...")
  • 14:52, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.04 Site Investigation (content was: ":The Contractor acknowledges that he has investigated and satisfied himself as to the conditions affecting the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials, availabi...")
  • 14:51, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.03 Interpretation of Quantities in Bid Schedule (content was: ":Where designated as estimated quantities, the quantities in the prepared bid schedule are approximate only. Payment to the Contractor will be made only for the actual quantities of work performed or materials furnished in accordance wit...")
  • 14:51, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.02 Contents of Bid Forms (content was: ":All papers included in, bound thereto or attached to the bid form are necessary parts thereof and shall not be detached, separated or altered. The Plans, Specifications, Supplemental Specifications, referred to in the Specifications, a...")
  • 14:50, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.05 Failure to Execute Contract (content was: "Failure of the bidder to execute the Contract and file acceptable security as defined in GP 3.03 within the time aforesaid shall be just...", and the only contributor was "Bdeane" (talk))
  • 14:50, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.04 Safety Hazards in Confined Spaces (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:50, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.04 Execution of Contract (content was: ":'''(a)''' The Contract shall be effective only upon receipt by the Administration of the proper, executed Contract form, and performance and payment bonds (if required), approval by the Board of Public Works, (if required), and executio...")
  • 14:50, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.03 Rights in and Use of Materials Found on the Project (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:50, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.03 Performance Bond and Payment Bond Requirements (content was: ":'''(a)''' Acceptable security for performance and payment shall be as stated in COMAR 21.06.07.01B.\ :'''(b)''' '''Performance and Payment Bonds.''' A performance and payment bond is required for all construction Contracts in excess o...")
  • 14:49, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.02 Return of Proposal Guaranty (content was: "All proposal guaranties, except those of the three lowest bidders, will be returned immediately following opening and the review of the p...", and the only contributor was "Bdeane" (talk))
  • 14:49, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.02 Construction Documents to Successful Bidder (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:49, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.01 Governing Order of Contract Documents (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:49, 15 February 2017 RApplewhite (talk | contribs) deleted page 3.01 Award of Contract (See GP-2.19) (content was: "Written notice of award shall be sent to the successful bidder. A Notice of Award may be rescinded at any time prior to execution of the...", and the only contributor was "Bdeane" (talk))
  • 14:31, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.05 Definitions (content was: "'''Award'''—The decision by a procurement agency to execute a purchase agreement or Contract after all necessary approvals have been obtained. '''Bid'''—A statement of price, terms of sale, and description of the supplies, services,...")
  • 14:30, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.04 Abbreviations (content was: "{| |'''AAN''' | |American Association of Nurserymen |- |'''AAPA''' | |American Association of Port Authorities |- |'''AAR''' | |Association of American Railroads |- |'''AASHTO''' | |American Association of State Highway and Transportati...")
  • 14:30, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.03 Organizational Definitions (content was: "'''Administration'''—The word "Administration" shall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02. '''Administrator'''—The chief executive officer of an Administration....")
  • 14:30, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.03 Definitions (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:30, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.02 References (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:30, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.01 Language (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:29, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.02 Organizational Structure (content was: "The Maryland Department of Transportation is composed of the following Administrations: :'''(i)''' Maryland Port Administration :'''(ii)''' Maryland Transit Administration :'''(iii)''' State Highway Administration :'''(iv)''' Marylan...")
  • 14:29, 15 February 2017 RApplewhite (talk | contribs) deleted page 1.01 General (content was: "Portions of Part III Technical Requirements of these Standard Specifications for Construction and Materials are written in the Active Voice writing style. Wherever in these General Provisions or in other Contract Documents the terms or...")
  • 14:28, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.01 Bid Irrevocable (content was: ":Unless otherwise provided in the Invitation for Bids, bid prices are irrevocable for 90 days following bid opening. Category:2016_Standard_Specifications_For_Construction_And_Materials")
  • 14:27, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.01 Bid Irrevocable (content was: "Unless otherwise provided in the Invitation for Bids, bid prices are irrevocable for 90 days following bid opening.", and the only contributor was "Bdeane" (talk))
  • 11:12, 15 February 2017 User account JaimieDonahoe2 (talk | contribs) was created
  • 09:57, 15 February 2017 User account Victor01E0 (talk | contribs) was created
  • 05:50, 15 February 2017 User account EffieJamison8 (talk | contribs) was created
  • 02:08, 15 February 2017 User account JeroldMidgett33 (talk | contribs) was created
  • 18:56, 14 February 2017 User account Renaldo Delos Reyes (talk | contribs) was created
  • 14:11, 14 February 2017 User account EJPElla8715127 (talk | contribs) was created
  • 09:53, 14 February 2017 User account RCAKirk07907194 (talk | contribs) was created
  • 09:35, 14 February 2017 User account CornellGiron0 (talk | contribs) was created
  • 06:14, 14 February 2017 User account StantonAiston1 (talk | contribs) was created
  • 01:14, 14 February 2017 User account LynetteHermann5 (talk | contribs) was created
  • 22:56, 13 February 2017 User account MichelineArdill (talk | contribs) was created
  • 22:31, 13 February 2017 User account MiguelEichelberg (talk | contribs) was created
  • 19:18, 13 February 2017 Bgilardi (talk | contribs) deleted page GP-1.05 Definitions (content was: ":'''Award'''—The decision by a procurement agency to execute a purchase agreement or Contract after all necessary approvals have been obtained. :'''Bid'''—A statement of price, terms of sale, and description of the supplies, service...")
  • 19:18, 13 February 2017 Bgilardi (talk | contribs) deleted page GP-1.04 Abbreviations (content was: ":{| |'''AAN''' | |American Association of Nurserymen |- |'''AAPA''' | |American Association of Port Authorities |- |'''AAR''' | |Association of American Railroads |- |'''AASHTO''' | |American Association of State Highway and Transportat...")
  • 19:17, 13 February 2017 Bgilardi (talk | contribs) deleted page GP-1.03 Organizational Definitions (content was: ":'''Administration'''—The word "Administration" shall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP-1.02. :'''Administrator'''—The chief ex...")
  • 19:17, 13 February 2017 Bgilardi (talk | contribs) deleted page GP-1.02 Organizational Structure (content was: ":The Maryland Department of Transportation is composed of the following Administrations: ::'''(i)''' [http://www.mpa.maryland.gov/ Maryland Port Administration] ::'''(ii)''' [http://mta.maryland.gov/ Maryland Transit Administration] :...")
  • 19:17, 13 February 2017 Bgilardi (talk | contribs) deleted page GP-1.01 General (content was: ":Portions of Part III Technical Requirements of these Standard Specifications for Construction and Materials are written in the Active Voice writing style. :Wherever in these General Provisions or in other Contract Documents the terms o...")
  • 18:58, 13 February 2017 User account CaryBirnie (talk | contribs) was created
  • 17:32, 13 February 2017 User account Rex13411600 (talk | contribs) was created
  • 11:26, 13 February 2017 User account RamonToliver956 (talk | contribs) was created
  • 04:51, 13 February 2017 User account VLLMadelaine (talk | contribs) was created
  • 23:12, 10 February 2017 User account GreggKeenum990 (talk | contribs) was created
  • 14:46, 10 February 2017 Mnemphos (talk | contribs) changed group membership for Lestertdavis from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 14:46, 10 February 2017 Mnemphos (talk | contribs) changed group membership for Rwheeler from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 19:20, 8 February 2017 Mnemphos (talk | contribs) changed group membership for Ebertch from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 19:19, 8 February 2017 Mnemphos (talk | contribs) changed group membership for Lestertldavis from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 18:28, 7 February 2017 User account Lestertdavis (talk | contribs) was created
  • 18:25, 7 February 2017 User account Lestertldavis (talk | contribs) was created
  • 18:10, 7 February 2017 User account Chegireddy (talk | contribs) was created
  • 12:26, 5 February 2017 User account PiperCapuano (talk | contribs) was created
  • 19:31, 4 February 2017 User account IvoryCrespin7 (talk | contribs) was created
  • 16:57, 1 February 2017 User account Ebertch (talk | contribs) was created
  • 01:21, 28 January 2017 User account EstelaLindeman (talk | contribs) was created
  • 16:13, 27 January 2017 Mnemphos (talk | contribs) changed group membership for Aranade1 from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 15:31, 27 January 2017 User account Aranade1 (talk | contribs) was created
  • 00:11, 24 January 2017 User account VernonDemarest8 (talk | contribs) was created
  • 12:23, 19 January 2017 User account Nvalentin (talk | contribs) was created
  • 07:39, 16 January 2017 User account Mahalia84F (talk | contribs) was created
  • 10:11, 15 January 2017 User account LuzAkx8652 (talk | contribs) was created
  • 20:12, 12 January 2017 Mnemphos (talk | contribs) changed group membership for Aranade from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 20:11, 12 January 2017 Mnemphos (talk | contribs) changed group membership for HAlfred from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 20:10, 12 January 2017 Mnemphos (talk | contribs) changed group membership for Rlinton from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 20:08, 12 January 2017 Mnemphos (talk | contribs) changed group membership for EJohnson from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 20:04, 12 January 2017 Mnemphos (talk | contribs) changed group membership for Sbuckley from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 01:33, 12 January 2017 User account EmmettBishop57 (talk | contribs) was created
  • 18:51, 11 January 2017 User account Rlinton (talk | contribs) was created
  • 18:43, 11 January 2017 User account Rwheeler (talk | contribs) was created
  • 08:33, 11 January 2017 User account KathaleenBugnion (talk | contribs) was created
  • 19:48, 10 January 2017 Mnemphos (talk | contribs) changed group membership for Kqureshi from (none) to Secure and 2016_Standard_Specifications_For_Construction_And_Materials
  • 19:48, 10 January 2017 User account Kqureshi (talk | contribs) was created
  • 17:12, 10 January 2017 Mnemphos (talk | contribs) uploaded File:1280px-BaltimoreLightRail.JPG (File uploaded with MsUpload)
  • 16:45, 10 January 2017 Mnemphos (talk | contribs) restored page Category:2016 Standard Specifications For Construction And Materials (2 revisions restored)
  • 16:44, 10 January 2017 Mnemphos (talk | contribs) deleted page Category:2016 Standard Specifications For Construction And Materials (content was: "__NOGLOSSARY__", and the only contributor was "Mnemphos" (talk))
  • 15:09, 10 January 2017 Mnemphos (talk | contribs) deleted page Leave (content was: "* Annual * Sick * Personal * Approved * Not Approved", and the only contributor was "Rchegireddy" (talk))
  • 12:58, 10 January 2017 User account SammyHemming54 (talk | contribs) was created
  • 05:04, 10 January 2017 User account MFLMerle88504060 (talk | contribs) was created
  • 17:06, 9 January 2017 User account Sbuckley (talk | contribs) was created
  • 14:47, 9 January 2017 Mnemphos (talk | contribs) changed group membership for 170185 from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 13:24, 9 January 2017 User account VerlaArida360 (talk | contribs) was created
  • 07:12, 7 January 2017 User account Evgarosa (talk | contribs) was created
  • 17:49, 6 January 2017 Mnemphos (talk | contribs) changed group membership for Galina1 from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 16:52, 6 January 2017 User account Aranade (talk | contribs) was created
  • 16:16, 6 January 2017 Mnemphos (talk | contribs) deleted page Matts Specs 2016 (content was: "Test", and the only contributor was "Mnemphos" (talk))
  • 15:59, 6 January 2017 User account EJohnson (talk | contribs) was created
  • 15:26, 6 January 2017 Mnemphos (talk | contribs) changed group membership for Keng from (none) to administrator and 2016_Standard_Specifications_For_Construction_And_Materials
  • 13:14, 6 January 2017 User account Keng (talk | contribs) was created
  • 21:44, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Cjohnson15 from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 21:44, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Cjohnson15 from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
  • 21:44, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Dbeck from (none) to Secure and 2016_Standard_Specifications_For_Construction_And_Materials
  • 21:43, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Jring from (none) to Secure and 2016_Standard_Specifications_For_Construction_And_Materials
  • 21:43, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Cminami from (none) to Secure and 2016_Standard_Specifications_For_Construction_And_Materials
  • 21:43, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Jharris2 from (none) to Secure and 2016_Standard_Specifications_For_Construction_And_Materials
  • 21:41, 5 January 2017 Mnemphos (talk | contribs) changed group membership for Jkrouse from (none) to Secure and 2016_Standard_Specifications_For_Construction_And_Materials
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)