821 BREAKAWAY BASE SUPPORT SYSTEMS

From MDOT Policy Manual
Jump to: navigation, search
821.01 DESCRIPTION.
Furnish and install breakaway base support systems or install AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02. furnished breakaway base support systems if applicable.
821.02 MATERIALS.
Breakaway base support systems shall conform to the breakaway requirements specified in AASHTOAmerican Association of State Highway and Transportation Officials SpecificationA written description of functional characteristics, or the nature of a construction item to be procured. It may include a for Structural Supports for Highway Signs, Luminaires, and Traffic Signals.
Breakaway Base Support Systems       QPLQualified Products List Award—The decision by a procurement agency to execute a purchase agreement or Contract after all necessary approvals have been obtained.
821.03 CONSTRUCTION.
Install breakaway base support systems for signals, lighting, and signing, including post hinge assembly units for sign structures, as specified in the Contract DocumentsThe written agreement executed between an Administration and the successful bidder, covering the performance of the work and furnishing of labor, equipment and materials, by which the Contractor is bound to perform the work and furnish the labor, equipment and materials, and by which the Administration is obligated to compensate him therefore at the mutually established and accepted rate or price. The Contract Documents shall include the Invitation for Bids, Notice to Contractors, Instructions to Bidders, Proposal, Contract Forms and Bonds, General Provisions, Specifications, Supplemental Specifications, all Special Provisions, all Technical Provisions, all Plans and Notices to Proceed, also any written Change Orders and Supplemental Agreements that are required to complete the construction of the work in an acceptable manner, including authorized extension thereof and in conformance with the manufacturer’s recommendations. Grade the ground adjacent to the breakaway base as specified in the Contract DocumentsThe written agreement executed between an Administration and the successful bidder, covering the performance of the work and furnishing of labor, equipment and materials, by which the Contractor is bound to perform the work and furnish the labor, equipment and materials, and by which the Administration is obligated to compensate him therefore at the mutually established and accepted rate or price. The Contract Documents shall include the Invitation for Bids, Notice to Contractors, Instructions to Bidders, Proposal, Contract Forms and Bonds, General Provisions, Specifications, Supplemental Specifications, all Special Provisions, all Technical Provisions, all Plans and Notices to Proceed, also any written Change Orders and Supplemental Agreements that are required to complete the construction of the work in an acceptable manner, including authorized extension thereof.
821.04 MEASUREMENT AND PAYMENT.
The payment will be full compensation for all excavation, backfill, grading, and for all material, labor, equipment, tools, and incidentals necessary to complete the work.
Breakaway Base Support Systems will be measured and paid for at the Contract unit price per each for breakaway support systems furnished and installed as specified in the Contract DocumentsThe written agreement executed between an Administration and the successful bidder, covering the performance of the work and furnishing of labor, equipment and materials, by which the Contractor is bound to perform the work and furnish the labor, equipment and materials, and by which the Administration is obligated to compensate him therefore at the mutually established and accepted rate or price. The Contract Documents shall include the Invitation for Bids, Notice to Contractors, Instructions to Bidders, Proposal, Contract Forms and Bonds, General Provisions, Specifications, Supplemental Specifications, all Special Provisions, all Technical Provisions, all Plans and Notices to Proceed, also any written Change Orders and Supplemental Agreements that are required to complete the construction of the work in an acceptable manner, including authorized extension thereof.
Pick up, delivery and installation of AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02. supplied breakaway base support systems will be measured and paid for at the Contract unit price per each for the pertinent Install Breakaway Base item.