818 SIGNAL STRUCTURES

From MDOT Policy Manual
Jump to: navigation, search
818.01 DESCRIPTION.
Pickup and install AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02. furnished signal structures. The grommets and miscellaneous hardware will be furnished by the AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02..
818.02 MATERIALS.
Signal StructuresBridges, culverts, catch basins, drop inlets, retaining walls, cribbing, manholes, end walls, buildings, sewers, service pipes, underdrains, foundation drains, steps, fences, and other features that may be encountered in the work and not otherwise classified. Hardware       Furnished by the AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02.
818.03 CONSTRUCTION.
Install the signal structure on a concrete foundation conforming to Section 801.
Breakaway base support systems, when specified, shall conform to Section 821.
Repair any finish on the signal structures and mounting hardware damaged during transportation and installation to match the original finish as approved by the EngineerAny person designated by the Administrator or the procurement officer, acting directly or through his duly authorized representative, such representative acting within the scope of the particular duties assigned to him or of the authority given him. at no additional cost to the AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02..
818.04 MEASUREMENT AND PAYMENT.
818.04.01  Installation of AdministrationShall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP 1.02. furnished signal structures will be measured and paid for at the Contract unit price per each for the type and size specified. The payment will be full compensation for the pickup, transportation and installation of all steel poles, mast arms, twin mast arms, triple mast arms, strain poles, and pedestal poles, breakaway base support systems, and for all material, labor, equipment, tools, and incidentals necessary to complete the work.
818.04.02  Concrete foundations will be measured and paid for as specified in 801.04.