301 CLASS 3 EXCAVATION FOR INCIDENTAL CONSTRUCTION

From MDOT Policy Manual
Jump to: navigation, search
301.01 DESCRIPTION.
Excavate below the specified elevation when unsuitable subgrade material is encountered.
301.02 MATERIALS.
Not applicable.
301.03 CONSTRUCTION.
Excavate to the length, width, and depth at authorized locations. Handle excavated material according to 402.03.01.
301.04 MEASUREMENT AND PAYMENT.
Class 3 Excavation for Incidental Construction will be measured and paid for at the Contract unit price per cubic yard. The payment will be full compensation for all material, labor, equipment, tools, and incidentals necessary to complete the work.