All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 00:03, 19 February 2017 User account ArlenShay49520 (talk | contribs) was created
- 22:43, 18 February 2017 User account Trudi42F267 (talk | contribs) was created
- 15:20, 18 February 2017 User account HyeFarnham (talk | contribs) was created
- 00:59, 18 February 2017 User account MirtaEnb0738 (talk | contribs) was created
- 21:20, 17 February 2017 User account WillardGolden (talk | contribs) was created
- 17:07, 17 February 2017 User account Elbert5218 (talk | contribs) was created
- 16:47, 17 February 2017 Mnemphos (talk | contribs) changed group membership for Mosborne from (none) to 2016_Standard_Specifications_For_Construction_And_Materials
- 16:10, 17 February 2017 User account Mosborne (talk | contribs) was created
- 12:30, 17 February 2017 User account Rashad8926 (talk | contribs) was created
- 10:43, 17 February 2017 User account Rolando83T (talk | contribs) was created
- 00:27, 17 February 2017 User account AddieBatman5288 (talk | contribs) was created
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.08 Eliminated Items (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.07 Late Payments (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.06 Final Acceptance and Final Payment (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.05 Progress Payments (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.04 Scope of Payment (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.03 Force Account Work (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:11, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.02 Payment Allowances for Stored Material (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:10, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.01 Measurement of Quantities (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:10, 16 February 2017 RApplewhite (talk | contribs) deleted page 7.16 Contractor's Responsibility for Work (content was: ":'''(a)''' Except as herein elsewhere provided, until final acceptance of the work by the Administration, the Contractor shall have the charge and care thereof and shall take every reasonable precaution against injury or damage to any pa...")
- 19:08, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.08 Eliminated Items (content was: ":In addition to the provisions of GP-4.04 Variations in Estimated Quantities, the following shall apply to Administration Contracts. :Should any Contract items contained in the Invitation for Bids be found unnecessary for the proper...")
- 19:08, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.07 Late Payments (content was: ":'''(a)''' Payments for semi final estimates shall be made within 30 days of the date when the amount becomes due and payable as evidenced by the Director’s Memorandum of Action. Payments for final estimates shall be made within 30 da...")
- 19:08, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.06 Final Acceptance and Final Payment (content was: ":'''(a)''' When the Contractor has completed a Contract, and it has been accepted for maintenance in conformance with the provisions of GP-5.13 (Acceptance for Maintenance), the Administration will...")
- 19:08, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.05 Progress Payments (content was: ":'''(a)''' '''Current Estimate.''' ::'''(1)''' '''Lump Sum Contracts.''' The Contractor shall furnish an acceptable breakdown of the lump sum Contract price showing the amount included therein for each principal category of the work....")
- 19:07, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.04 Scope of Payment (content was: ":Payment to the Contractor will be made from the actual quantities of Contract items performed in conformance with the Plans and Specifications. If, upon completion of the construction, these actual quantities show either an increase or...")
- 19:07, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.03 Force Account Work (content was: ":When the Contractor is required to perform work due to additions or changes to the Contract for which there are no applicable unit prices, the Administration and Contractor will make every effort to come to an agreed price for the perfo...")
- 19:07, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.02 Payment Allowances for Stored Material (content was: ":When the Contractor requests payment allowance for materials, the following terms and conditions shall apply: ::'''(a)''' For superstructure members delivered on the project site, an allowance of 100 percent of the material cost plus f...")
- 19:06, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-7.01 Measurement of Quantities (content was: " :For all items of work, other than those to be paid by lump sum, after the work is completed and before final payment is made, the Engineer will make final measurements to determine the quantities of various items of work performed as t...")
- 19:03, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.13 Hauling Over Proposed Structures (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:03, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.12 Structure Underclearances and Overhead Clearances (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.14 Storing Materials and Equipment On/Against Structures Restriction (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.11 Construction and Waste Material (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.10 Recycled or Rehandled Material (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.09 Hazardous Material (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.08 Aerial Electric Lines (750 Volts or More) (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.07 Use of Explosives (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:02, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.06 Bridges and Other Work in or over Waters of the State (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.05 Railroad Highway Grade Crossings and Separations (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.04 Restoration of Surfaces Opened by Permit (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.03 Compliance with Maryland Vehicle Laws (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.02 Load and Speed Limitations (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.01 Moving of Equipment (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:00, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.14 Storing Materials and Equipment On/Against Structures Restriction (content was: ":Materials, and waste shall not be stored on or against any structure or structure element and equipment shall not be placed or used on any structure during the construction phase or finished or final configuration unless the written per...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.13 Hauling Over Proposed Structures (content was: ":If the Contractor desires to haul across the proposed structures, they shall first apply for and obtain written permission from the Administration’s District Engineer for each type of hauling equipment to be used. The approval will i...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.12 Structure Underclearances and Overhead Clearances (content was: ":'''General.''' The requirements for underclearances at structures shall apply to the entire usable roadway areas including shoulders. Unless otherwise specified in the Contract Documents or directed by the Engineer, the Contractor sha...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.11 Construction and Waste Material (content was: ":All wood, trash, debris, and other foreign matter shall be removed from within the right-of-way limits and disposed of by the Contractor. The Contractor shall make all necessary arrangements to obtain suitable disposal locations and sh...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.10 Recycled or Rehandled Material (content was: ":Refer to 900.03 in the Contract Documents. Category: 2016 Standard Specifications For Construction And Materials")
- 18:58, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.09 Hazardous Material (content was: ":'''(a)''' If the Contractor encounters or exposes during construction any abnormal conditions that indicate the presence of a hazardous material or toxic waste, work in the area shall immediately be suspended and the Engineer notified....")
- 18:57, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.08 Aerial Electric Lines (750 Volts or More) (content was: ":The Contractor shall be aware that State law requires that a 10 foot radial clearance shall be maintained for all construction equipment and materials in relation to electric lines carrying 750 volts or more. Because the State law is m...")
- 18:54, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.07 Use of Explosives (content was: ":All blasting operations, including the storage and handling of explosives and blasting agents, shall be performed in conformance with the applicable provisions of the Contract Documents and all other pertinent Federal, State, and local...")