All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 13:56, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.03 Unacceptable Materials (content was: ":'''(a)''' Materials represented by samples taken and tested in accordance with the specified tests and failing to meet required values shall be considered to be defective regardless of prior tests or approvals. :'''(b)''' Unless otherw...")
- 13:56, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.02 Storage and Handling of Materials (content was: ":Materials shall be so stored as to assure the preservation of their quality and acceptability for the work. Stored materials, even though approved before storage, may again be inspected prior to their use in the work. Stored materials...")
- 13:55, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-6.01 General (content was: ":All materials shall meet all quality requirements of the Contract. In order to expedite the inspection and testing of the materials, the Contractor shall notify the procurement officer in writing of the sources from which he proposes t...")
- 13:49, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.13 Acceptance for Maintenance (content was: ":'''(a)''' '''Partial Acceptance for Maintenance.''' If at any time during the performance of the work the Contractor substantially completes a unit or portion of the work, he may request the procurement officer to make final inspection...")
- 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.14 Filing of Claim by Contractor (content was: "Unless a shorter period is prescribed by law or elsewhere in this Contract, :'''(a)''' The Contractor shall file a written notice of claim for extension of time, equitable adjustment, extra compensation, damages, or any other matter (wh...")
- 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.15 Disputes (content was: ":'''(a)''' This Contract is subject to the provisions of Title 15, Subtitle 2, State Finance and Procurement Article (Dispute Resolution) of the Annotated Code of Maryland and COMAR 21.10 (Administrative and Civil Remedies). :'''(b)'''...")
- 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.12 Failure to Maintain Entire Project (content was: "'''''On Administration Contracts GP 5.12 Failure to Maintain Entire Project does not apply; TC 4.02 shall apply.''''' Failure on the par...", and the only contributor was "Bdeane" (talk))
- 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.11 Maintenance of Work During Construction (content was: ":'''(a)''' The Contractor shall maintain the work during construction and until acceptance. This maintenance shall constitute continuous and effective work prosecuted as required with adequate equipment and forces to the end that all pa...")
- 13:48, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.10 Load Restrictions (content was: ":'''(a)''' The Contractor shall comply with all State and local requirements pertaining to speed, size and weight of motor vehicles. :'''(b)''' The Administration may indicate in the Contract load restrictions on any road or structure w...")
- 13:47, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.09 Removal of Defective Work (content was: "All work and materials which do not conform to the requirement of the Contract will be considered unacceptable, unless otherwise determin...", and the only contributor was "Bdeane" (talk))
- 13:47, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.08 Inspection of Work (content was: "All materials and each part or detail of the work shall be subject at all times to inspection by the procurement officer or his authorize...", and the only contributor was "Bdeane" (talk))
- 13:47, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.07 Authority and Duties Of Inspectors (content was: "Inspectors shall be authorized to inspect all work done and all material furnished. Such inspection may extend to all or any part of the...", and the only contributor was "Bdeane" (talk))
- 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.06 Cooperation Between Contractors (content was: ":'''(a)''' Separate Contractors on adjoining or overlapping work shall cooperate with each other as necessary. Such cooperation shall include: :# Arrangement and conduct of work; :# Storage and disposal of materials, etc., by each in s...")
- 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.05 Cooperation with Utilities (content was: "It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in the...", and the only contributor was "Bdeane" (talk))
- 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.04 Cooperation by Contractor (content was: "The Contractor will keep available on the project site at all times one complete set of Contract Documents. The Contractor shall give th...", and the only contributor was "Bdeane" (talk))
- 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.03 Discrepancies in the Contract Documents (content was: "In the event the Contractor discovers any discrepancies in the Contract Documents, he shall immediately notify the procurement officer....", and the only contributor was "Bdeane" (talk))
- 13:46, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.02 Conformity with Contract Requirements (content was: "All work performed and all materials furnished shall be in conformity with the Contract requirements. In the event the procurement offic...", and the only contributor was "Bdeane" (talk))
- 13:44, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.01 Authority of the Procurement Officer (content was: ":'''(a)''' The procurement officer shall decide all questions which may arise as to the quality and acceptability of materials furnished and work performed and as to the rate of progress of said work; all questions which may arise as to...")
- 13:43, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.15 Disputes (content was: ":'''(a)''' This Contract is subject to the provisions of Title 15, Subtitle 2, State Finance and Procurement Article (Dispute Resolution) of the Annotated Code of Maryland and COMAR 21.10 (Administrative and Civil Remedies). :'''(b)'''...")
- 13:43, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.14 Filing of Claim by Contractor (content was: ":Unless a shorter period is prescribed by law or elsewhere in this Contract, :'''(a)''' The Contractor shall file a written notice of claim for extension of time, equitable adjustment, extra compensation, damages, or any other matter (w...")
- 13:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.13 Acceptance for Maintenance (content was: ":'''(a)''' '''Partial Acceptance for Maintenance.''' If at any time during the performance of the work the Contractor substantially completes a unit or portion of the work, he may request the procurement officer to make final inspection...")
- 13:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.12 Failure to Maintain Entire Project (content was: "'''''On Administration Contracts GP-5.12 Failure to Maintain Entire Project does not apply; TC-4.02 shall apply.''''' :Failure on the part of the Contractor, at any time, to comply with the provis...")
- 13:42, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.11 Maintenance of Work During Construction (content was: ":'''(a)''' The Contractor shall maintain the work during construction and until acceptance. This maintenance shall constitute continuous and effective work prosecuted as required with adequate equipment and forces to the end that all pa...")
- 13:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.10 Load Restrictions (content was: ":'''(a)''' The Contractor shall comply with all State and local requirements pertaining to speed, size and weight of motor vehicles. :'''(b)''' The Administration may indicate in the Contract load restrictions on any road or structure w...")
- 13:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.09 Removal of Defective Work (content was: ":All work and materials which do not conform to the requirement of the Contract will be considered unacceptable, unless otherwise determined acceptable under the provisions in GP-5.02. :...")
- 13:41, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.08 Inspection of Work (content was: ":All materials and each part or detail of the work shall be subject at all times to inspection by the procurement officer or his authorized representative, and the Contractor will be held strictly to the materials, workmanship, and the d...")
- 13:40, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.07 Authority and Duties Of Inspectors (content was: ":Inspectors shall be authorized to inspect all work done and all material furnished. Such inspection may extend to all or any part of th...", and the only contributor was "Bdeane" (talk))
- 13:40, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.06 Cooperation Between Contractors (content was: ":'''(a)''' Separate Contractors on adjoining or overlapping work shall cooperate with each other as necessary. Such cooperation shall include: ::'''(1)''' Arrangement and conduct of work; ::'''(2)''' Storage and disposal of materials,...")
- 13:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.05 Cooperation with Utilities (content was: ":It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in their present or relocated positions and that no additional compensation will be allowed for delays, i...")
- 13:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.04 Cooperation by Contractor (content was: ":The Contractor will keep available on the project site at all times one complete set of Contract Documents. :The Contractor shall give the work the constant attention necessary to facilitate the progress thereof, and shall cooperate wi...")
- 13:39, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.03 Discrepancies in the Contract Documents (content was: ":In the event the Contractor discovers any discrepancies in the Contract Documents, he shall immediately notify the procurement officer. The procurement officer will then make such corrections and interpretations as may be deemed necess...")
- 13:38, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.02 Conformity with Contract Requirements (content was: ":All work performed and all materials furnished shall be in conformity with the Contract requirements. :In the event the procurement officer finds the materials or the finished product in which the materials are used or the work perform...")
- 13:38, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-5.01 Authority of the Procurement Officer (content was: ":'''(a)''' The procurement officer shall decide all questions which may arise as to the quality and acceptability of materials furnished and work performed and as to the rate of progress of said work; all questions which may arise as to...")
- 13:31, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.10 Warranty of Construction (content was: "'''''On Administration Contracts GP-4.10 Warranty of Construction does not apply unless otherwise specified in the Contract Documents.''''' :'''(a)''' In addition to any other warranties at law or set out elsewhere in this Contract, the...")
- 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.09 Final Clean Up (content was: "Upon completion of the work specified in the Contract and before final payment will be made, the construction area and all other adjoinin...", and the only contributor was "Bdeane" (talk))
- 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.08 Unauthorized Work (content was: "Work done contrary to or regardless of the instructions of the procurement officer; work done beyond the lines and grades shown on the Co...", and the only contributor was "Bdeane" (talk))
- 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.07 Negotiated Payment Provision (content was: "If the Contractor is entitled to an equitable adjustment, the Contractor shall be allowed to add the following maximum percentages for overhead and profit to his costs for labor and materials: :'''(a)''' Twenty percent may be added by...")
- 13:30, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.06 Changes (content was: ":'''(a)''' The procurement officer may unilaterally, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make any change in the work within the general scope of the Contract...")
- 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.05 Differing Site Conditions (content was: ":'''(a)''' The Contractor shall promptly, and before such conditions are disturbed, notify the procurement officer in writing of: :# Subsurface or latent physical conditions at the site differing materially from those indicated in this...")
- 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.04 Variations in Estimated Quantities (content was: "'''''On Administration Contracts, in addition to GP-4.04 Variations in Estimated Quantities, TC-7.08 Estimated Items shall apply.''''' W...", and the only contributor was "Bdeane" (talk))
- 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.03 Entire Contract (content was: "The Contract Documents represent the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, re...", and the only contributor was "Bdeane" (talk))
- 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.02 General Provisions Controlling (content was: "In the event of a conflict between these General Provisions and any other provision of the Contract Documents, these General Provisions s...", and the only contributor was "Bdeane" (talk))
- 13:29, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.01 Intent of Contract (content was: ":'''(a)''' The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections, dimensions, and other data shown on the Plans or as modified by written orders including the fur...")
- 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.10 Warranty of Construction (content was: "'''''On Administration Contracts GP-4.10 Warranty of Construction does not apply unless otherwise specified in the Contract Documents.''''' :'''(a)''' In addition to any other warranties at law or set out elsewhere in this Contract, the...")
- 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.09 Final Clean Up (content was: ":Upon completion of the work specified in the Contract and before final payment will be made, the construction area and all other adjoining areas, other than those owned by him, occupied by the Contractor during the construction of said...")
- 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.08 Unauthorized Work (content was: ":Work done contrary to or regardless of the instructions of the procurement officer; work done beyond the lines and grades shown on the Contract Drawings, or as given; or any extra work done without written authority will be considered a...")
- 13:27, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.07 Negotiated Payment Provision (content was: ":If the Contractor is entitled to an equitable adjustment, the Contractor shall be allowed to add the following maximum percentages for o...", and the only contributor was "Bdeane" (talk))
- 13:26, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.06 Changes (content was: ":'''(a)''' The procurement officer may unilaterally, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make any change in the work within the general scope of the Contract...")
- 13:25, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.01 Intent of Contract (content was: ":'''(a)''' The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections, dimensions, and other data shown on the Plans or as modified by written orders including the fur...")
- 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.02 General Provisions Controlling (content was: ":In the event of a conflict between these General Provisions and any other provision of the Contract Documents, these General Provisions shall prevail unless such other provision expressly provides to the contrary. Category: 2016 Stand...")