All public logs

From MDOT Policy Manual
Jump to: navigation, search

Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs      

 

Show patrol log | Show tag log

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.03 Entire Contract (content was: ":The Contract Documents represent the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, representations or agreements either written or oral. Category: 2016 Standard Specifications For Co...")
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.04 Variations in Estimated Quantities (content was: "'''''On Administration Contracts, in addition to GP-4.04 Variations in Estimated Quantities, TC-7.08 Eliminated Items shall apply.''''' :Where the quantity of a pay item in this Contract is an estimated quantity and where the actual...")
  • 13:24, 16 February 2017 RApplewhite (talk | contribs) deleted page GP-4.05 Differing Site Conditions (content was: ":'''(a)''' The Contractor shall promptly, and before such conditions are disturbed, notify the procurement officer in writing of: ::'''(1)''' Subsurface or latent physical conditions at the site differing materially from those indicated...")
  • 15:07, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.22 Multiple or Alternate Bids (content was: "Unless multiple or alternate bids are requested in the solicitation, these bids may not be accepted. However, if a bidder clearly indica...", and the only contributor was "Bdeane" (talk))
  • 15:07, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.23 Bid Protests (content was: "A bid protest must be in writing and filed with the procurement officer. Oral objections, whether or not acted on, are not protests. :'''(a)''' '''Time for Filing.''' :# A bid protest shall be filed not later than 7 days after the bas...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.21 Resident Business Preference (content was: ":'''(a)''' When awarding a Contract by competitive sealed bidding, if the State in which a nonresident firm submitting the lowest responsible bid is located gives a competitive advantage to its resident businesses, a procurement agency m...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.20 Tie Bids (content was: "'''''On Administration Federal Aid Contracts, the preference to in State Contractors does not apply.''''' :'''(a)''' '''Definition.''' Tie bids are responsive bids from responsible bidders that are identical in price, terms and conditi...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.19 Bid Evaluation and Award (content was: ":'''(a)''' '''General.''' The Contract is to be awarded to the responsible and responsive bidder whose bid meets the requirements and evaluation criteria set forth in the Invitation for Bids, and is either the lowest bid price or lowest...")
  • 15:06, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.18 Rejection of All Bids (content was: ":'''(a)''' After opening of bids or proposals but before award, all bids or proposals may be rejected in whole or in part when the procurement officer, with the approval of the agency head or his designee, determines that this action is...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.17 Rejection of Individual Bids or Proposals (content was: ":'''(a)''' Any bid may be rejected in whole or in part when it is in the best interest of the State to do so. :'''(b)''' Reasons for rejection of a bid may include but are not limited to: :# The bid is not responsive i.e., it does not...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.16 Cancellation of Invitations for Bids (content was: ":'''(a)''' Before opening of bids a solicitation may be canceled in whole or in part when the State determines this action is fiscally advantageous or otherwise in its best interest. :'''(b)''' When a solicitation is canceled before bid...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.15 Minor Irregularities or Informalities (content was: ":'''(a)''' '''General.''' Minor irregularities or informalities in bids, as defined below, may be waived if the procurement officer determines that it shall be in the State's best interest. The procurement officer may either give a bid...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.14 Mistakes in Bids (content was: ":'''(a)''' '''Mistakes Discovered Before Opening.''' A bidder may correct mistakes discovered before the time and date set for bid opening by withdrawing or correcting the bid as provided in GP 2.11. :'''(b)''' '''Confirmation of Bid.'...")
  • 15:05, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.13 Opening and Recording of Bids (content was: ":'''(a)''' '''Opening and Recording.''' Bids and modifications shall be opened publicly, at the time, date, and place designated in the Invitation for Bids. The name of each bidder, the bid price, and such other information as is deeme...")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.12 Late Bids, Late Withdrawals, and Late Modification (content was: ":'''(a)''' '''Policy.''' Any bid received at the place designated in the solicitation after the time and date set for receipt of bids is late. Any request for withdrawal or request for modification received after the time and date set...")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.11 Pre-Opening Modification or Withdrawal Of Bids (content was: ":'''(a)''' '''Procedure.''' Bids may be modified or withdrawn by written notice delivered to and received in the office designated in the Invitation for Bids before the time and date set for bid opening. Written notice of modification...")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.10 Amendments to Invitations for Bids (content was: ":'''(a)''' '''Form.''' Each amendment to an Invitation for Bids shall be in writing and identified as such. :'''(b)''' '''Acknowledgements.''' Unless otherwise provided, the bidder shall acknowledge receipt of all amendments.")
  • 15:04, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.09 Communications and Interpretations-Prior to Bid Opening (content was: "Any information regarding the requirements or the interpretation of any provision of the General Provisions, Special General Provisions,...", and the only contributor was "Bdeane" (talk))
  • 15:03, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.08 Delivery of Bids (content was: "Each bid must be submitted in a sealed envelope plainly marked to indicate its contents. When sent by mail, the sealed bid must be addre...", and the only contributor was "Bdeane" (talk))
  • 15:03, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.07 Proposal Guaranty (content was: ":'''(a)''' No bid will be considered for any Contract in excess of $100,000 unless accompanied by a guaranty in an amount not less than 5 percent of the amount bid, or such amount as may be specified elsewhere in the bid documents and ma...")
  • 15:02, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.06 Preparation of Bid (content was: "'''''On Administration Contracts the Contractor may elect to submit his bid on forms generated in the development of his bid as specified in TC 2.02 Preparation of Bid.''''' :'''(a)''' The bidder shall submit his bid upon the blank form...")
  • 15:02, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.05 Taxes-Responsibility for Payment, Exemptions, Forms to File, Etc. (content was: ":'''(a)''' The Contractor is responsible for, and by submitting a bid agrees to pay, all retail sales, income, real estate, sales and use, transportation and special taxes applicable to and assessable against any materials, equipment, pr...")
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.04 Site Investigation (content was: "The Contractor acknowledges that he has investigated and satisfied himself as to the conditions affecting the work, including but not res...", and the only contributor was "Bdeane" (talk))
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.04 Owner/Operator (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.03 Value Engineering Change Proposals (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 15:01, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.03 Interpretation of Quantities in Bid Schedule (content was: "Where designated as estimated quantities, the quantities in the prepared bid schedule are approximate only. Payment to the Contractor wi...", and the only contributor was "Bdeane" (talk))
  • 15:00, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.02 Preparation of Bid (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 15:00, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.02 Contents of Bid Forms (content was: "All papers included in, bound thereto or attached to the bid form are necessary parts thereof and shall not be detached, separated or alt...", and the only contributor was "Bdeane" (talk))
  • 15:00, 15 February 2017 RApplewhite (talk | contribs) deleted page 2.01 Project Classification (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.05 Failure to Execute Contract (content was: ":Failure of the bidder to execute the Contract and file acceptable security as defined in GP-3.03 within the time aforesaid shall be just cause for the annulment of the award and...")
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.04 Execution of Contract (content was: ":'''(a)''' The Contract shall be effective only upon receipt by the Administration of the proper, executed Contract form, and performance and payment bonds (if required), approval by the Board of Public Works, (if required), and executio...")
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.03 Performance Bond and Payment Bond Requirements (content was: ":'''(a)''' Acceptable security for performance and payment shall be as stated in [http://www.dsd.state.md.us/comar/comarhtml/21/21.06.07.01.htm COMAR 21.06.07.01B]. :'''(b)''' '''Performance and Payment Bonds.''' A performance and paym...")
  • 14:57, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.02 Return of Proposal Guaranty (content was: ":All proposal guaranties, except those of the three lowest bidders, will be returned immediately following opening and the review of the proposals. The guaranty of the three lowest bidders will be returned following the execution of the...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-3.01 Award of Contract (See GP-2.19) (content was: ":Written notice of award shall be sent to the successful bidder. A Notice of Award may be rescinded at any time prior to execution of the Contract by the Administrator. Category: 2016 Standard Specifications For Construction And Mater...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.23 Bid Protests (content was: ":A bid protest must be in writing and filed with the procurement officer. Oral objections, whether or not acted on, are not protests. ::'''(a)''' '''Time for Filing.''' :::'''(1)''' A bid protest shall be filed not later than 7 days a...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.22 Multiple or Alternate Bids (content was: ":Unless multiple or alternate bids are requested in the solicitation, these bids may not be accepted. However, if a bidder clearly indicates a base bid, it shall be considered for award as though it were the only bid submitted by the bi...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.21 Resident Business Preference (content was: ":'''(a)''' When awarding a Contract by competitive sealed bidding, if the State in which a nonresident firm submitting the lowest responsible bid is located gives a competitive advantage to its resident businesses, a procurement agency m...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.20 Tie Bids (content was: "'''''On Administration Federal Aid Contracts, the preference to in-State Contractors does not apply.''''' :'''(a)''' '''Definition.''' Tie bids are responsive bids from responsible bidders that are identical in price, terms and conditi...")
  • 14:56, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.19 Bid Evaluation and Award (content was: ":'''(a)''' '''General.''' The Contract is to be awarded to the responsible and responsive bidder whose bid meets the requirements and evaluation criteria set forth in the Invitation for Bids, and is either the lowest bid price or lowest...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.18 Rejection of All Bids (content was: ":'''(a)''' After opening of bids or proposals but before award, all bids or proposals may be rejected in whole or in part when the procurement officer, with the approval of the agency head or his designee, determines that this action is...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.17 Rejection of Individual Bids or Proposals (content was: ":'''(a)''' Any bid may be rejected in whole or in part when it is in the best interest of the State to do so. :'''(b)''' Reasons for rejection of a bid may include but are not limited to: ::'''(1)''' The bid is not responsive i.e., it...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.16 Cancellation of Invitations for Bids (content was: ":'''(a)''' Before opening of bids a solicitation may be canceled in whole or in part when the State determines this action is fiscally advantageous or otherwise in its best interest. :'''(b)''' When a solicitation is canceled before bid...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.15 Minor Irregularities or Informalities (content was: ":'''General.''' Minor irregularities or informalities in bids, as defined below, may be waived if the procurement officer determines that it shall be in the State's best interest. The procurement officer may either give a bidder an opp...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.14 Mistakes in Bids (content was: ":'''(a)''' '''Mistakes Discovered Before Opening.''' A bidder may correct mistakes discovered before the time and date set for bid opening by withdrawing or correcting the bid as provided in GP-2.11 Pre-Opening Modification or Withdra...")
  • 14:55, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.13 Opening and Recording of Bids (content was: ":'''(a)''' '''Opening and Recording.''' Bids and modifications shall be opened publicly, at the time, date, and place designated in the Invitation for Bids. The name of each bidder, the bid price, and such other information as is deeme...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.12 Late Bids, Late Withdrawals, and Late Modification (content was: ":'''(a)''' '''Policy.''' Any bid received at the place designated in the solicitation after the time and date set for receipt of bids is late. Any request for withdrawal or request for modification received after the time and date set...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.11 Pre-Opening Modification or Withdrawal of Bids (content was: ":'''(a)''' '''Procedure.''' Bids may be modified or withdrawn by written notice delivered to and received in the office designated in the Invitation for Bids before the time and date set for bid opening. Written notice of modification...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.11 Pre-Opening Modification or Withdrawal Of Bids (content was: ":'''(a)''' '''Procedure.''' Bids may be modified or withdrawn by written notice delivered to and received in the office designated in th...", and the only contributor was "Bdeane" (talk))
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.10 Amendments to Invitations for Bids (content was: ":'''(a)''' '''Form.''' Each amendment to an Invitation for Bids shall be in writing and identified as such. :'''(b)''' '''Acknowledgements.''' Unless otherwise provided, the bidder shall acknowledge receipt of all amendments. Catego...")
  • 14:54, 15 February 2017 RApplewhite (talk | contribs) deleted page GP-2.09 Communications and Interpretations Prior to Bid Opening (content was: ":Any information regarding the requirements or the interpretation of any provision of the General Provisions, Special General Provisions, Specifications or any part of the bidding documents shall be requested, in writing, from the procur...")
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)