All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 13:24, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.05 Determination and Extension Contract Time (content was: "The Contractor shall complete the work contracted for in an acceptable manner within the number of working days, calendar days, or calend...", and the only contributor was "Bdeane" (talk))
- 13:15, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.04 Cultural Resources (content was: "The Contractor shall be aware of the potential of cultural resources on the project. During the construction phase, whenever anything th...", and the only contributor was "Bdeane" (talk))
- 13:13, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.03 Subcontracting and Subcontractors (content was: "In addition to the provisions of GP 8.01 (Subcontracting), the following shall apply on Administration Contracts: The subcontractors na...", and the only contributor was "Bdeane" (talk))
- 13:10, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.02 Notice to Proceed and Project Schedule (content was: "Within 45 days after the Contract has been executed, the Administration will issue to the Contractor a Notice to Proceed. This notice wi...", and the only contributor was "Bdeane" (talk))
- 13:09, 31 October 2018 Ukelly (talk | contribs) deleted page TC 5.01 Insurance (content was: "In addition to the provisions of GP 7.14 (Liability Insurance), the following shall apply on Administration Contracts. The Contractor s...", and the only contributor was "Bdeane" (talk))
- 13:07, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.14 Storing Materials and Equipment On/Against Structures Restriction (content was: "Materials and equipment shall not be stored on or against any structure unless written permission is obtained from the Administration’s...", and the only contributor was "Bdeane" (talk))
- 13:07, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.13 Hauling Over Proposed Structures (content was: "If the Contractor desires to haul across the proposed structures, they shall first apply for and obtain written permission from the Admin...", and the only contributor was "Bdeane" (talk))
- 13:05, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.11 Construction and Waste Material (content was: "All wood, trash, debris, and other foreign matter shall be removed from within the right of way limits and disposed of by the Contractor....", and the only contributor was "Bdeane" (talk))
- 13:05, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.12 Structure Underclearances and Overhead Clearances (content was: "'''General.''' The requirements for underclearances at structures shall apply to the entire usable roadway areas including shoulders. U...", and the only contributor was "Bdeane" (talk))
- 13:04, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.10 Recycled or Rehandled Material (content was: "For recycled or rehandled material furnished by the Contractor for use on the project, the Engineer may require the Contractor to have th...", and the only contributor was "Bdeane" (talk))
- 13:04, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.09 Hazardous Material (content was: ":'''(a)''' If the Contractor encounters or exposes during construction any abnormal conditions that indicate the presence of a hazardous...", and the only contributor was "Bdeane" (talk))
- 13:03, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.08 Aerial Electric Lines (750 Volts or More) (content was: " The Contractor shall be aware that State law requires that a 10 foot radial clearance shall be maintained for all construction equipment...", and the only contributor was "Bdeane" (talk))
- 13:02, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.07 Use of Explosives (content was: "All blasting operations, including the storage and handling of explosives and blasting agents, shall be performed in conformance with the...", and the only contributor was "Bdeane" (talk))
- 13:02, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.06 Bridges and Other Work in or over Waters of the State (content was: "All work in, on, or over waters under control of the Department of the Army or the Environmental Protection Agency of the United States s...", and the only contributor was "Bdeane" (talk))
- 13:01, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.05 Railroad Highway Grade Crossings and Separations (content was: "When the Contractor is required to haul materials across the tracks of any railroad, or elects to do so, the Contractor shall make arrang...", and the only contributor was "Bdeane" (talk))
- 12:58, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.04 Restoration of Surfaces Opened by Permit (content was: "The right to construct or reconstruct any utility in the highway or to grant permits for same at any time is reserved by the Administrati...", and the only contributor was "Bdeane" (talk))
- 12:58, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.03 Compliance with Maryland Vehicle Laws (content was: "The Maryland Vehicle Law requires each motor vehicle, trailer, semitrailer, and pole trailer driven on a highway to be registered. Ther...", and the only contributor was "Bdeane" (talk))
- 12:55, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.02 Load and Speed Limitations (content was: "The Bidder's attention is directed to the Annotated Code of Maryland, Transportation Article, Section 24 206, authorizing the appropriate...", and the only contributor was "Bdeane" (talk))
- 12:55, 31 October 2018 Ukelly (talk | contribs) deleted page TC 6.01 Moving of Equipment (content was: "The Contractor will not be permitted to move over or operate on any road (except on the road under construction) any power shovels, rolle...", and the only contributor was "Bdeane" (talk))
- 12:54, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.08 Eliminated Items (content was: "In addition to the provisions of GP-4.04 Variations in Estimated Quantities, the following shall apply to Administration Contracts. Sho...", and the only contributor was "Bdeane" (talk))
- 12:53, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.07 Late Payments (content was: "'''(a)''' Payments for semi final estimates shall be made within 30 days of the date when the amount becomes due and payable as evidenced...", and the only contributor was "Bdeane" (talk))
- 12:51, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.06 Final Acceptance and Final Payment (content was: "'''(a)''' When the Contractor has completed a Contract, and it has been accepted for maintenance in conformance with the provisions of GP 5.13 (Acceptance for Maintenance), the Administration will promptly proceed: :# To make any necess...")
- 12:51, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.05 Progress Payments (content was: "'''(a)''' '''Current Estimate.''' :1. '''Lump Sum Contracts.''' The Contractor shall furnish an acceptable breakdown of the lump sum Co...", and the only contributor was "Bdeane" (talk))
- 12:49, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.04 Scope of Payment (content was: "Payment to the Contractor will be made from the actual quantities of Contract items performed in conformance with the Plans and Specifica...", and the only contributor was "Bdeane" (talk))
- 12:48, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.03 Force Account Work (content was: "When the Contractor is required to perform work due to additions or changes to the Contract for which there are no applicable unit prices...", and the only contributor was "Bdeane" (talk))
- 12:48, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.02 Payment Allowances for Stored Material (content was: "When the Contractor requests payment allowance for materials, the following terms and conditions shall apply: :'''(a)''' For superstruct...", and the only contributor was "Bdeane" (talk))
- 12:47, 31 October 2018 Ukelly (talk | contribs) deleted page TC 7.01 Measurement of Quantities (content was: " For all items of work, other than those to be paid by lump sum, after the work is completed and before final payment is made, the Engin...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.05 Dispute Mediation (content was: "When a dispute arises out of or relates to the Contract or breach thereof, and if the dispute can not be settled through negotiation or t...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.04 Suspension of Work (content was: "In addition to the provisions of GP 8.07 (Suspension of Work), the following shall apply on Administration Contracts. The Engineer will...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.03 Use and Possession Prior to Completion (content was: "In addition to the provisions of GP 7.15 (Use and Possession Prior to Completion) the following will apply on Administration Contracts:...", and the only contributor was "Bdeane" (talk))
- 12:46, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.02 Failure to Adequately Maintain Project (content was: "GP 5.12 (Failure to Maintain Entire Project) is not applicable to Administration Contracts. The provisions of this TC shall apply. If...", and the only contributor was "Bdeane" (talk))
- 12:45, 31 October 2018 Ukelly (talk | contribs) deleted page TC 4.01 Working Drawings (content was: "'''(a)''' '''General.''' The Plans shall be supplemented by working drawings as necessary to adequately control the work. All authorize...", and the only contributor was "Bdeane" (talk))
- 12:39, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.04 Safety Hazards in Confined Spaces (content was: " The Contractor shall be responsible for gas detection in and ventilation of confined spaces. When procedures require workers to enter...", and the only contributor was "Bdeane" (talk))
- 12:39, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.03 Rights in and Use of Materials Found on the Project (content was: "The Contractor, with the approval of the Engineer may use on the project any excavated stone, gravel, sand, or other material conforming...", and the only contributor was "Bdeane" (talk))
- 12:38, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.02 Construction Documents to Successful Bidder (content was: "The successful bidder on each Contract advertised by the Administration will be sent upon award of the Contract five sets of Plans, five...", and the only contributor was "Bdeane" (talk))
- 12:28, 31 October 2018 Ukelly (talk | contribs) deleted page TC 3.01 Governing Order of Contract Documents (content was: "The Contract Documents, including but not limited to the Standard Specifications, the Special Provisions Inserts, the Plans, Special Prov...", and the only contributor was "Bdeane" (talk))
- 12:27, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.06 Partnering (content was: "The Administration invites the Contractor, subcontractors, and suppliers to participate in a voluntary partnership agreement for the work...", and the only contributor was "Bdeane" (talk))
- 12:25, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.05 Debarment/Suspension (content was: "Pursuant to the emergency regulations which were approved by the Administrative and Executive Legislative Review (AELR) Committee of the...", and the only contributor was "Bdeane" (talk))
- 12:22, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.04 Owner/Operator (content was: "For the purpose of labor compliance, the term "Owner/Operator" will be defined as being the individual who owns and operates their own ve...", and the only contributor was "Bdeane" (talk))
- 12:22, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.03 Value Engineering Change Proposals (content was: "The Contractor may submit to the District Engineer, in writing, Value Engineering Change Proposals (VECP) for modifying the Contract Docu...", and the only contributor was "Bdeane" (talk))
- 12:21, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.02 Preparation of Bid (content was: "The requirements of GP 2.06 (Preparation of Bid) is modified for Administration Contracts to include the following after paragraph (a):...", and the only contributor was "Bdeane" (talk))
- 12:19, 31 October 2018 Ukelly (talk | contribs) deleted page TC 2.01 Project Classification (content was: "The Administration will estimate the cost of the Contract and classify it within one cost group and letter designation as follows: :{| b...", and the only contributor was "Bdeane" (talk))
- 12:19, 31 October 2018 Ukelly (talk | contribs) deleted page TC 1.03 Definitions (content was: "'''Additional Work'''—Work not required or provided for in the original Contract. '''Administration'''—The term shall be construed t...", and the only contributor was "Bdeane" (talk))
- 12:18, 31 October 2018 Ukelly (talk | contribs) deleted page TC 1.02 References (content was: "Reference to Specifications or procedures beginning with the letters M, R, or T shall be understood to be AASHTO. Reference to Specifica...", and the only contributor was "Bdeane" (talk))
- 12:18, 31 October 2018 Ukelly (talk | contribs) deleted page TC 1.01 Language (content was: "These specifications incorporate the selective use of the imperative mood. In general, specifications in the imperative mood will imply...", and the only contributor was "Bdeane" (talk))
- 12:17, 31 October 2018 Ukelly (talk | contribs) deleted page TC-4.02 Failure to Adequately Maintain Project (content was: "GP 5.12 (Failure to Maintain Entire Project) is not applicable to Administration Contracts. The provisions of this TC shall apply. If...", and the only contributor was "Bdeane" (talk))
- 12:15, 31 October 2018 Ukelly (talk | contribs) deleted page GP 1.01 - General (content was: "Portions of Part III Technical Requirements of these Standard Specifications for Construction and Materials are written in the Active Voi...", and the only contributor was "Bdeane" (talk))
- 12:15, 31 October 2018 Ukelly (talk | contribs) deleted page CATEGORY 900-MATERIALS (content was: "===900 GENERAL=== ===901 AGGREGATES=== ===902 PORTLAND CEMENT CONCRETE AND RELATED PRODUCTS=== ===903 MASONRY PRODUCTS===...")
- 12:14, 31 October 2018 Ukelly (talk | contribs) deleted page CATEGORY 800-TRAFFIC (content was: "===801 CONCRETE FOUNDATIONS=== ===802 GALVANIZED STEEL BEAM SIGN POSTS|802 GALVANIZED STEEL BEAM SIG...", and the only contributor was "Bgilardi" (talk))
- 12:14, 31 October 2018 Ukelly (talk | contribs) deleted page CATEGORY 700-LANDSCAPING (content was: "===701 SUBSOIL AND TOPSOIL=== ===702 THRU 703 — RESERVED=== ===...", and the only contributor was "Bgilardi" (talk))