All public logs
From MDOT Policy Manual
Combined display of all available logs of MDOT Policy Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.02 Load and Speed Limitations (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:01, 16 February 2017 RApplewhite (talk | contribs) deleted page 6.01 Moving of Equipment (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 19:00, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.14 Storing Materials and Equipment On/Against Structures Restriction (content was: ":Materials, and waste shall not be stored on or against any structure or structure element and equipment shall not be placed or used on any structure during the construction phase or finished or final configuration unless the written per...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.13 Hauling Over Proposed Structures (content was: ":If the Contractor desires to haul across the proposed structures, they shall first apply for and obtain written permission from the Administration’s District Engineer for each type of hauling equipment to be used. The approval will i...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.12 Structure Underclearances and Overhead Clearances (content was: ":'''General.''' The requirements for underclearances at structures shall apply to the entire usable roadway areas including shoulders. Unless otherwise specified in the Contract Documents or directed by the Engineer, the Contractor sha...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.11 Construction and Waste Material (content was: ":All wood, trash, debris, and other foreign matter shall be removed from within the right-of-way limits and disposed of by the Contractor. The Contractor shall make all necessary arrangements to obtain suitable disposal locations and sh...")
- 18:59, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.10 Recycled or Rehandled Material (content was: ":Refer to 900.03 in the Contract Documents. Category: 2016 Standard Specifications For Construction And Materials")
- 18:58, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.09 Hazardous Material (content was: ":'''(a)''' If the Contractor encounters or exposes during construction any abnormal conditions that indicate the presence of a hazardous material or toxic waste, work in the area shall immediately be suspended and the Engineer notified....")
- 18:57, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.08 Aerial Electric Lines (750 Volts or More) (content was: ":The Contractor shall be aware that State law requires that a 10 foot radial clearance shall be maintained for all construction equipment and materials in relation to electric lines carrying 750 volts or more. Because the State law is m...")
- 18:54, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.07 Use of Explosives (content was: ":All blasting operations, including the storage and handling of explosives and blasting agents, shall be performed in conformance with the applicable provisions of the Contract Documents and all other pertinent Federal, State, and local...")
- 18:54, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.06 Bridges and Other Work in or over Waters of the State (content was: ":All work in, on, or over waters under control of the Department of the Army or the Environmental Protection Agency of the United States shall conform to all applicable Federal permits, rules, and regulations. All of these rules and reg...")
- 18:54, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.05 Railroad Highway Grade Crossings and Separations (content was: ":When the Contractor is required to haul materials across the tracks of any railroad, or elects to do so, the Contractor shall make arrangements with that railroad for any new private crossings or for the use of any existing private cros...")
- 18:53, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.04 Restoration of Surfaces Opened by Permit (content was: ":The right to construct or reconstruct any utility in the highway or to grant permits for same at any time is reserved by the Administration. :Upon the presentation of a duly authorized and satisfactory permit, which provides that all n...")
- 18:53, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.03 Compliance with Maryland Vehicle Laws (content was: ":The Maryland Vehicle Law requires each motor vehicle, trailer, semitrailer, and pole trailer driven on a highway to be registered. :There are some exceptions to this general requirement concerning nonresidents. If a nonresident is ope...")
- 18:53, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.02 Load and Speed Limitations (content was: ":The Bidder's attention is directed to the Annotated Code of Maryland, Transportation Article, Section [http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?article=gtr§ion=24-206&ext=html&session=2015RS&tab=subject5 24-206], autho...")
- 18:52, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-6.01 Moving of Equipment (content was: ":The Contractor will not be permitted to move over or operate on any road (except on the road under construction) any power shovels, rollers, concrete mixers, cranes, tractors, or any other heavy equipment of weight or dimensions in exce...")
- 18:38, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.05 Determination and Extension Contract Time (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:37, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.04 Cultural Resources (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:37, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.03 Subcontracting and Subcontractors (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:37, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.02 Notice to Proceed and Project Schedule (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:37, 16 February 2017 RApplewhite (talk | contribs) deleted page 5.01 Insurance (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:37, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-5.05 Determination and Extension Contract Time (content was: ":The Contractor shall complete the work contracted for in an acceptable manner within the number of working days, calendar days, or calendar date as specified in the Invitation for Bids. :The Engineer will make available to the Contract...")
- 18:36, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-5.04 Cultural Resources (content was: ":The Contractor shall be aware of the potential of cultural resources on the project. During the construction phase, whenever anything that might appear to be a cultural resource of a historical, archeological, or paleontological nature...")
- 18:36, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-5.03 Subcontracting and Subcontractors (content was: ":In addition to the provisions of GP-8.01 (Subcontracting), the following shall apply on Administration Contracts: :The subcontractors named in the Contractor's bid and approved by the Administration and those...")
- 18:35, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-5.02 Notice to Proceed and Project Schedule (content was: ":Within 45 days after the Contract has been executed, the Administration will issue to the Contractor a Notice to Proceed. This notice will stipulate the date on or before which the Contractor is expected to begin work. No work shall b...")
- 18:35, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-5.01 Insurance (content was: ":In addition to the provisions of GP-7.14 (Liability Insurance), the following shall apply on Administration Contracts. :The Contractor shall maintain in full force and effect third party legal liability...")
- 18:06, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.05 Dispute Mediation (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:06, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.04 Suspension of Work (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.03 Use and Possession Prior to Completion (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.02 Failure to Adequately Maintain Project (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:05, 16 February 2017 RApplewhite (talk | contribs) deleted page 4.01 Working Drawings (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 18:03, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-4.05 Dispute Mediation (content was: ":When a dispute arises out of or relates to the Contract or breach thereof, and if the dispute can not be settled through negotiation or the partnering issue resolution process, either party may first elect to try in good faith to settle...")
- 18:03, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-4.04 Suspension of Work (content was: ":In addition to the provisions of GP-8.07 (Suspension of Work), the following shall apply on Administration Contracts. :The Engineer will have the authority to suspend the work wholly or in part due to the...")
- 18:03, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-4.03 Use and Possession Prior to Completion (content was: ":In addition to the provisions of GP-7.15 (Use and Possession Prior to Completion) the following will apply on Administration Contracts: :Upon written authorization of the procurement o...")
- 18:02, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-4.02 Failure to Maintain Project (content was: ":GP-5.12 (Failure to Maintain Entire Project) is not applicable to Administration Contracts. The provisions of this TC shall apply. :If the Contractor, at any time, fails to respond to the...")
- 18:02, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-4.01 Working Drawings (content was: ":'''(a)''' '''General.''' The Plans shall be supplemented by working drawings as necessary to adequately control the work. All authorized alterations affecting the requirements and information given on the working drawings shall be in...")
- 17:58, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-3.04 Safety Hazards in Confined Spaces (content was: ":The Contractor shall be responsible for gas detection in and ventilation of confined spaces. :When procedures require workers to enter confined spaces such as steel or concrete box section type superstructures, particularly when the in...")
- 17:57, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-3.03 Rights in and Use of Materials Found on the Project (content was: ":The Contractor, with the approval of the Engineer may use on the project any excavated stone, gravel, sand, or other material conforming to the requirements of the Contract Documents. :When these materials are used for select, capping,...")
- 17:57, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-3.02 Construction Documents to Successful Bidder (content was: ":The successful bidder on each Contract advertised by the Administration will be sent upon award of the Contract five sets of Plans, five Invitation for Bids Books, and two sets of Cross Sections free of charge. Any additional Plan sets...")
- 17:56, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-3.01 Governing Order of Contract Documents (content was: ":The Contract Documents, including but not limited to the Standard Specifications, the Special Provisions Inserts, the Plans, Special Provisions, and all supplementary documents are essential parts of the Contract, and a requirement occu...")
- 17:51, 16 February 2017 RApplewhite (talk | contribs) deleted page 2.06 Partnering (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 17:50, 16 February 2017 RApplewhite (talk | contribs) deleted page 2.05 Debarment/Suspension (content was: "Placeholder", and the only contributor was "RApplewhite" (talk))
- 17:48, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-2.06 Partnering (content was: ":The Administration invites the Contractor, subcontractors, and suppliers to participate in a voluntary partnership agreement for the work. The partnership will be structured to draw on the strengths of each organization through open co...")
- 17:48, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-2.05 Debarment/Suspension (content was: ":Pursuant to the emergency regulations which were approved by the Administrative and Executive Legislative Review (AELR) Committee of the Maryland General Assembly on July 27, 1982, and which went into effect on July 28, 1982, the Maryla...")
- 17:48, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-2.04 Owner/Operator (content was: ":For the purpose of labor compliance, the term "Owner/Operator" will be defined as being the individual who owns and operates their own vehicle. :The prevailing wage rates shall not apply to these individuals. However, they shall appea...")
- 17:47, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-2.03 Value Engineering Change Proposals (content was: ":The Contractor may submit to the District Engineer, in writing, Value Engineering Change Proposals (VECP) for modifying the Contract Documents for the purpose of reducing the total cost of construction without reducing design capacity o...")
- 17:47, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-2.02 Preparation of Bid (content was: ":The requirements of GP-2.06 (Preparation of Bid) is modified for Administration Contracts to include the following after paragraph (a): ::The Contractor may elect to submit the bid on forms generated in t...")
- 17:46, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-2.01 Project Classification (content was: ":The Administration will estimate the cost of the Contract and classify it within one cost group and letter designation as follows: ::{| border="1" style="border-collapse:collapse" |'''COST GROUP ESTIMATE''' |'''COST GROUP LETTER CLASS'...")
- 16:39, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-1.03 Definitions (content was: ":'''Additional Work'''—Work not required or provided for in the original Contract. :'''Administration'''—The term shall be construed to be the Maryland Department of Transportation State Highway Administration as established in conf...")
- 16:38, 16 February 2017 RApplewhite (talk | contribs) deleted page TC-1.02 References (content was: ":Reference to Specifications or procedures beginning with the letters M, R, or T shall be understood to be AASHTO. :Reference to Specifications or procedures beginning with the letters A, B, C, D, E, F, G, ES or P shall be understood to...")