=Primary Guidance=
 
=Primary Guidance=
:* Pre-fabricated metal buildings are most cost-effective type of construction.
+
== Rail ==
:* Minimum floor loading is 1200 psf.  Assume bulk commodities will be stacked to the eaves.
+
:* Incorporate rail stipulated within the forecast window and where feasible.
:* For roof loading, consider additional dead load to include solar panels or green roof, as agency energy and environmental programs require (~30 psf additional DL).
+
:* Locate new berth and terminal facilities near existing rail lines.
:* For mission critical facilities located in areas susceptible to flooding, consider including a backup generator installed above the 100 year FEMA flood plain.
+
:* In new construction, configure the berth structure for future rail installation if rail is not already included in the work.
 +
:* Locate landside and berth heavy lift areas near rail (for project cargo) or configure site development in the vicinity including future provision for such.
  
[[Category:Practical Design Guidance]]
+
==  Truckaway ==
 +
:* Configure berth and backlands to accommodate trucks and design trailers required in the forecast window.
 +
:* Whenever possible, develop berth and backlands to readily accommodate the largest design trailers with relatively minor retrofit.
 +
 
 +
[[Category:Practical Design Guidance]][[Category:Secure]]

Revision as of 17:18, 4 December 2017

Intermodal

Primary Guidance

Rail

  • Incorporate rail stipulated within the forecast window and where feasible.
  • Locate new berth and terminal facilities near existing rail lines.
  • In new construction, configure the berth structure for future rail installation if rail is not already included in the work.
  • Locate landside and berth heavy lift areas near rail (for project cargo) or configure site development in the vicinity including future provision for such.

Truckaway

  • Configure berth and backlands to accommodate trucks and design trailers required in the forecast window.
  • Whenever possible, develop berth and backlands to readily accommodate the largest design trailers with relatively minor retrofit.