| :::* A feasibility study for construction sequencing, operations impact, service impact, and budget impact should be performed when a service shutdown is proposed. Additional operational cost such as a bus bridge, transit ambassadors, additional field supervision, service schedule change, and revenue loss should all be considered as part of the project budget impact.   | :::* A feasibility study for construction sequencing, operations impact, service impact, and budget impact should be performed when a service shutdown is proposed. Additional operational cost such as a bus bridge, transit ambassadors, additional field supervision, service schedule change, and revenue loss should all be considered as part of the project budget impact.   | ||
| :::* An hour-to-hour construction activity schedule (including the testing and certification activities) should be developed to estimate the required shutdown time.   | :::* An hour-to-hour construction activity schedule (including the testing and certification activities) should be developed to estimate the required shutdown time.   | ||
| − | + | :::*Coordinate operations with public relations. Provided information to ridership through press releases, social media posts, and other media outlets. | |
| [[Category:Practical Design Guidance]] | [[Category:Practical Design Guidance]] | ||
Latest revision as of 14:52, 14 September 2017
| Rehabilitation | ||
| ContentsPrimary Guidance
 | ||
| DiscussionGeneral
 Fort McHenry and Baltimore Harbor Tunnels
 Baltimore Metro Subway Tunnel
 Single Tracking Operations or Service Shutdowns
 | 