:* Rehabilitation project designs must be closely coordinated with the appropriate tunnel operations staff. In almost all cases, shutting down a tunnel bore for an extended period is not possible due to the resulting severe traffic impacts from the reduced traffic capacity. Operations staff for both tunnels develop and maintain weekly nighttime closure schedules for the tunnel bores. | :* Rehabilitation project designs must be closely coordinated with the appropriate tunnel operations staff. In almost all cases, shutting down a tunnel bore for an extended period is not possible due to the resulting severe traffic impacts from the reduced traffic capacity. Operations staff for both tunnels develop and maintain weekly nighttime closure schedules for the tunnel bores. | ||
− | ::* BHT: weekly nighttime closures Monday through Thursday only, from 9:00 | + | ::* BHT: weekly nighttime closures Monday through Thursday only, from 9:00 pm to 4:30 am |
::* FMT: southbound closures 7:00 pm to 4:30 am; northbound closures 8:00 pm to 4:30 am. | ::* FMT: southbound closures 7:00 pm to 4:30 am; northbound closures 8:00 pm to 4:30 am. | ||
:* Routine maintenance work is scheduled to coincide with nighttime closure schedules and needs to be accounted for during project design. While closure schedules and maintenance operations are subject to change, they must be used as a basis for developing how proposed rehabilitation work can be performed and sequenced. | :* Routine maintenance work is scheduled to coincide with nighttime closure schedules and needs to be accounted for during project design. While closure schedules and maintenance operations are subject to change, they must be used as a basis for developing how proposed rehabilitation work can be performed and sequenced. |
Revision as of 14:46, 14 September 2017
Rehabilitation | ||
ContentsPrimary Guidance
| ||
DiscussionGeneral
Fort McHenry and Baltimore Harbor Tunnels
Baltimore Metro Subway Tunnel
Single Tracking Operations or Service Shutdowns
|