Difference between revisions of "Transit Building Maintenance Facility Design"
From MDOT Policy Manual
Beichhorst (talk | contribs) |
Beichhorst (talk | contribs) |
||
Line 1: | Line 1: | ||
{| class="wikitable" | {| class="wikitable" | ||
+ | |||
|- | |- | ||
| colspan="3" | | | colspan="3" | | ||
Line 23: | Line 24: | ||
::* Functionality | ::* Functionality | ||
:::* Operations: | :::* Operations: | ||
− | ::::* Pre- | + | ::::* Pre-Inspections; |
::::* Process Flow – train movement; | ::::* Process Flow – train movement; | ||
::::* Maintenance – heavy, daily, cleaning, and inspections. | ::::* Maintenance – heavy, daily, cleaning, and inspections. |
Revision as of 14:51, 22 May 2017
Maintenance Facility Design | ||
Primary Guidance
| ||
Discussion
| ||
Site Considerations
|