Difference between revisions of "Near Shore and on Shore: Shipping Channels"
From MDOT Policy Manual
(Created page with "{| class="wikitable" |- | colspan="3" | '''Shipping Channels''' |- | colspan="3" | =Primary Guidance= Channel Dredging Depth: 50 ft. minimum depth required for the shipping...") |
|||
Line 2: | Line 2: | ||
|- | |- | ||
| colspan="3" | | | colspan="3" | | ||
− | ''' | + | '''Interlocking Turnout''' |
|- | |- | ||
Line 8: | Line 8: | ||
=Primary Guidance= | =Primary Guidance= | ||
Channel Dredging Depth: 50 ft. minimum depth required for the shipping channels in the Chesapeake Bay and Baltimore Harbor | Channel Dredging Depth: 50 ft. minimum depth required for the shipping channels in the Chesapeake Bay and Baltimore Harbor | ||
− | |||
|- | |- | ||
| colspan="3" | | | colspan="3" | | ||
Line 14: | Line 13: | ||
=Discussion= | =Discussion= | ||
Channel dredge depth can be up to 2 ft. beyond the 50 ft. depth. | Channel dredge depth can be up to 2 ft. beyond the 50 ft. depth. | ||
+ | |||
[[Category:Practical Design Guidance]] | [[Category:Practical Design Guidance]] | ||
=See Also= | =See Also= | ||
− | + | *[[Roadway: Design Vehicles|Roadway: Design Vehicles]] | |
*[[Practical Design Implementation Guidance|Practical Design Implementation Guidance]] | *[[Practical Design Implementation Guidance|Practical Design Implementation Guidance]] |
Revision as of 17:17, 26 October 2016
Interlocking Turnout | ||
Primary GuidanceChannel Dredging Depth: 50 ft. minimum depth required for the shipping channels in the Chesapeake Bay and Baltimore Harbor | ||
DiscussionChannel dredge depth can be up to 2 ft. beyond the 50 ft. depth. See Also |