Difference between revisions of "Transit Building Maintenance Facility Design"
From MDOT Policy Manual
Beichhorst (talk | contribs) |
|||
Line 25: | Line 25: | ||
:::* Operations: | :::* Operations: | ||
::::* Pre-Inspections; | ::::* Pre-Inspections; | ||
− | ::::* Process Flow – train movement | + | ::::* Process Flow – train and bus movement |
::::* Maintenance – heavy, daily, cleaning, and inspections. | ::::* Maintenance – heavy, daily, cleaning, and inspections. | ||
:::* Yard Functionality: | :::* Yard Functionality: | ||
− | ::::* Track layout | + | ::::* Track and bus lane layout |
::::* Site constraints – drainage and storm water management, circulation patterns, program requirements, environmental requirements | ::::* Site constraints – drainage and storm water management, circulation patterns, program requirements, environmental requirements | ||
:::* Facility program: | :::* Facility program: |
Revision as of 14:55, 14 September 2017
Maintenance Facility Design | ||
Primary Guidance
| ||
Discussion
| ||
Site Considerations
|