Difference between revisions of "Transit Building Maintenance Facility Design"
From MDOT Policy Manual
Beichhorst (talk | contribs) |
Beichhorst (talk | contribs) |
||
Line 28: | Line 28: | ||
:::* Yard Functionality: | :::* Yard Functionality: | ||
::::* Track layout; | ::::* Track layout; | ||
− | ::::* Site constraints – drainage and | + | ::::* Site constraints – drainage and storm water management, circulation patterns, program requirements, environmental requirements |
:::* Facility program: | :::* Facility program: | ||
::::* Provide adequate facilities for personnel and administration including parking. | ::::* Provide adequate facilities for personnel and administration including parking. | ||
= Site Considerations = | = Site Considerations = | ||
− | :* A Maintenance Facility Building should be located on a relatively flat site with sufficient utility service such as power, water, and sewer available and a suitable outfall for storm drains and | + | :* A Maintenance Facility Building should be located on a relatively flat site with sufficient utility service such as power, water, and sewer available and a suitable outfall for storm drains and storm water management to minimize capital costs. The site should be integrated with operations planning to optimize future (20- year horizon) operations by minimizing dead-head runs and other operational efficiencies. The site should have sufficient highway/roadway access to allow for efficient delivery of vehicles. Highway/roadway access should not be susceptible to flooding. |
Revision as of 19:43, 16 May 2017
Maintenance Facility Design | ||
Primary Guidance
| ||
Discussion
Site Considerations
|