:::* A feasibility study for construction sequencing, operations impact, service impact, and budget impact should be performed when a service shutdown is proposed. Additional operational cost such as a bus bridge, transit ambassadors, additional field supervision, service schedule change, and revenue loss should all be considered as part of the project budget impact. | :::* A feasibility study for construction sequencing, operations impact, service impact, and budget impact should be performed when a service shutdown is proposed. Additional operational cost such as a bus bridge, transit ambassadors, additional field supervision, service schedule change, and revenue loss should all be considered as part of the project budget impact. | ||
:::* An hour-to-hour construction activity schedule (including the testing and certification activities) should be developed to estimate the required shutdown time. | :::* An hour-to-hour construction activity schedule (including the testing and certification activities) should be developed to estimate the required shutdown time. | ||
− | + | :::*Coordinate operations with public relations. Provided information to ridership through press releases, social media posts, and other media outlets. | |
[[Category:Practical Design Guidance]] | [[Category:Practical Design Guidance]] |
Latest revision as of 14:52, 14 September 2017
Rehabilitation | ||
ContentsPrimary Guidance
| ||
DiscussionGeneral
Fort McHenry and Baltimore Harbor Tunnels
Baltimore Metro Subway Tunnel
Single Tracking Operations or Service Shutdowns
|