Difference between revisions of "Rail: Guideway Systems"
From MDOT Policy Manual
Beichhorst (talk | contribs) |
Beichhorst (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 10: | Line 10: | ||
:* Railway signaling equipment is required for safe train movement. Communications-based train control should be used when possible. | :* Railway signaling equipment is required for safe train movement. Communications-based train control should be used when possible. | ||
:* Traction electrification costs can be reduced by considering these systems during alignment and capacity planning. Higher voltages should be used when possible. | :* Traction electrification costs can be reduced by considering these systems during alignment and capacity planning. Higher voltages should be used when possible. | ||
− | :* Two-way radio communications using | + | :* Two-way radio communications using MDFIRST 700 MHz Statewide trunked radio system must be provided. |
Line 26: | Line 26: | ||
::* Two-way radio communication. | ::* Two-way radio communication. | ||
+ | |- | ||
+ | | colspan="3" | | ||
== Communications Network Infrastructure == | == Communications Network Infrastructure == | ||
Latest revision as of 16:04, 26 May 2017
Maintenance Facility Design | ||
Primary Guidance
| ||
Discussion
| ||
Communications Network Infrastructure
|