Difference between revisions of "MDOT Practical Design Implementation Manual"
From MDOT Policy Manual
(→MDOT Network Primary Guidance) |
(→Environmental (can we combine any of these?)) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
=MDOT Network Primary Guidance= | =MDOT Network Primary Guidance= | ||
− | |||
#New vs. reconstruction | #New vs. reconstruction | ||
#Design life | #Design life | ||
Line 9: | Line 8: | ||
#Expected capacity | #Expected capacity | ||
#Level of service | #Level of service | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | ==Environmental== | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=Facilities= | =Facilities= |
Latest revision as of 19:31, 4 August 2016
MDOT Network Primary Guidance
- New vs. reconstruction
- Design life
- Maintenance of traffic / operations
- Long term maintenance
- Expected capacity
- Level of service
Environmental
Facilities
Roadway
Bridge
Primary Guidance
Goes Here
Description
Goes Here
Planning
- Facility Selection
- Signature (Needs to be defined. Need new name.)
- Workhorse (Needs to be defined and differentiated. Need new name.)
- Pedestrian (hiker/biker)
- Design Criteria
- Vehicle
Design Elements
- Bridge Width
- Length
- Seismic/Wind Design
- Bike Lanes
- Pedestrian Walkway
- Construction Staging
- Retaining walls
- Hydraulics
- Bridge and Culvert