Difference between revisions of "MDOT Practical Design Implementation Manual"

From MDOT Policy Manual
Jump to: navigation, search
(Bridge)
(Environmental (can we combine any of these?))
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
=MDOT Network Primary Guidance=
 
=MDOT Network Primary Guidance=
 +
#New vs. reconstruction
 +
#Design life
 +
#Maintenance of traffic / operations
 +
#Long term maintenance
 +
#Expected capacity
 +
#Level of service
  
 +
==Environmental==
  
 
=Facilities=
 
=Facilities=
 
==Roadway==
 
==Roadway==
 
==Bridge==
 
==Bridge==
Primary guidance
+
===Primary Guidance===
Description
+
Goes Here
 +
 
 +
===Description===
 +
Goes Here
 +
 
 
==Planning==
 
==Planning==
Facility selection
+
#Facility Selection
Signature (Needs to be defined. Need new name.)
+
#Signature (Needs to be defined. Need new name.)
Workhorse (Needs to be defined and differentiated. Need new name.)
+
#Workhorse (Needs to be defined and differentiated. Need new name.)
Pedestrian (hiker/biker)
+
#Pedestrian (hiker/biker)
Design Criteria
+
#Design Criteria
Vehicle
+
#Vehicle
 
==Design Elements==
 
==Design Elements==
 
#[[Bridge Width| Bridge Width]]
 
#[[Bridge Width| Bridge Width]]
Length
+
#Length
Seismic / wind design
+
#Seismic/Wind Design
Bike lanes
+
#Bike Lanes
Pedestrian walkway
+
#Pedestrian Walkway
Construction staging
+
#Construction Staging
Retaining walls
+
#Retaining walls
Hydraulics
+
#Hydraulics
Bridge and culvert
+
#Bridge and Culvert
  
 
==Tunnel==
 
==Tunnel==

Latest revision as of 19:31, 4 August 2016


MDOT Network Primary Guidance

  1. New vs. reconstruction
  2. Design life
  3. Maintenance of traffic / operations
  4. Long term maintenance
  5. Expected capacity
  6. Level of service

Environmental

Facilities

Roadway

Bridge

Primary Guidance

Goes Here

Description

Goes Here

Planning

  1. Facility Selection
  2. Signature (Needs to be defined. Need new name.)
  3. Workhorse (Needs to be defined and differentiated. Need new name.)
  4. Pedestrian (hiker/biker)
  5. Design Criteria
  6. Vehicle

Design Elements

  1. Bridge Width
  2. Length
  3. Seismic/Wind Design
  4. Bike Lanes
  5. Pedestrian Walkway
  6. Construction Staging
  7. Retaining walls
  8. Hydraulics
  9. Bridge and Culvert

Tunnel

Toll Plaza

Building

Docking

Dredging

Navigation

Lots

Rail

Airside

Systems

Incidental/Miscellaneous