Difference between revisions of "Tunnel Rehabilitation"
From MDOT Policy Manual
(→Baltimore Metro Subway Tunnel) |
(→Discussion) |
||
Line 18: | Line 18: | ||
::** Fort McHenry Tunnel (FMT) – Interstate 95 under the Patapsco River | ::** Fort McHenry Tunnel (FMT) – Interstate 95 under the Patapsco River | ||
::** Baltimore Harbor Tunnel (BHT) – Interstate 895 under the Patapsco River | ::** Baltimore Harbor Tunnel (BHT) – Interstate 895 under the Patapsco River | ||
− | ::* Maryland Transit Administration (MTA) | + | ::* Maryland Department of Transportation Maryland Transit Administration (MDOT MTA) |
::** Baltimore Metro – Baltimore Metro Subway under Baltimore City | ::** Baltimore Metro – Baltimore Metro Subway under Baltimore City | ||
Line 35: | Line 35: | ||
=== Single Tracking Operations or Service Shutdowns === | === Single Tracking Operations or Service Shutdowns === | ||
− | :* Single tracking operations or service shutdowns may be available to provide longer track outage hour, but is subject to MTA’s approval. | + | :* Single tracking operations or service shutdowns may be available to provide longer track outage hour, but is subject to MDOT MTA’s approval. |
::* Single tracking operations: | ::* Single tracking operations: | ||
:::* Provide a longer track outage hour in one tunnel tube without shutting down the Metro service. | :::* Provide a longer track outage hour in one tunnel tube without shutting down the Metro service. |
Revision as of 14:50, 14 September 2017
Rehabilitation | ||
ContentsPrimary Guidance
| ||
DiscussionGeneral
Fort McHenry and Baltimore Harbor Tunnels
Baltimore Metro Subway Tunnel
Single Tracking Operations or Service Shutdowns
|