Difference between revisions of "MDOT Practical Design Implementation Manual"
From MDOT Policy Manual
(→Facilities) |
(→Environmental (can we combine any of these?)) |
||
(16 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | [[Category:MDOT Practical Design Implementation Manual]] | |
− | MDOT Network Primary Guidance | + | =MDOT Network Primary Guidance= |
− | + | #New vs. reconstruction | |
+ | #Design life | ||
+ | #Maintenance of traffic / operations | ||
+ | #Long term maintenance | ||
+ | #Expected capacity | ||
+ | #Level of service | ||
+ | |||
+ | ==Environmental== | ||
=Facilities= | =Facilities= | ||
− | + | ==Roadway== | |
==Bridge== | ==Bridge== | ||
− | ===[[ | + | ===Primary Guidance=== |
+ | Goes Here | ||
+ | |||
+ | ===Description=== | ||
+ | Goes Here | ||
+ | |||
+ | ==Planning== | ||
+ | #Facility Selection | ||
+ | #Signature (Needs to be defined. Need new name.) | ||
+ | #Workhorse (Needs to be defined and differentiated. Need new name.) | ||
+ | #Pedestrian (hiker/biker) | ||
+ | #Design Criteria | ||
+ | #Vehicle | ||
+ | ==Design Elements== | ||
+ | #[[Bridge Width| Bridge Width]] | ||
+ | #Length | ||
+ | #Seismic/Wind Design | ||
+ | #Bike Lanes | ||
+ | #Pedestrian Walkway | ||
+ | #Construction Staging | ||
+ | #Retaining walls | ||
+ | #Hydraulics | ||
+ | #Bridge and Culvert | ||
+ | |||
==Tunnel== | ==Tunnel== | ||
==Toll Plaza== | ==Toll Plaza== |
Latest revision as of 19:31, 4 August 2016
MDOT Network Primary Guidance
- New vs. reconstruction
- Design life
- Maintenance of traffic / operations
- Long term maintenance
- Expected capacity
- Level of service
Environmental
Facilities
Roadway
Bridge
Primary Guidance
Goes Here
Description
Goes Here
Planning
- Facility Selection
- Signature (Needs to be defined. Need new name.)
- Workhorse (Needs to be defined and differentiated. Need new name.)
- Pedestrian (hiker/biker)
- Design Criteria
- Vehicle
Design Elements
- Bridge Width
- Length
- Seismic/Wind Design
- Bike Lanes
- Pedestrian Walkway
- Construction Staging
- Retaining walls
- Hydraulics
- Bridge and Culvert