| Line 2: | Line 2: | ||
=MDOT Network Primary Guidance= | =MDOT Network Primary Guidance= | ||
| + | SYSTEM PRIMARY GUIDANCE | ||
| + | #New vs. reconstruction | ||
| + | #Design life | ||
| + | #Maintenance of traffic / operations | ||
| + | #Long term maintenance | ||
| + | #Expected capacity | ||
| + | #Level of service | ||
| + | =Environmental (can we combine any of these?)= | ||
| + | 3Documentation (NEPA, MEPA) | ||
| + | Constraints on sequencing and LOD limits | ||
| + | o Permitting (MDE, USCOE, DNR, MNCPPC, EPA, NPS) | ||
| + | Stormwater management | ||
| + | Sediment and erosion control | ||
| + | • Stabilization | ||
| + | Forest conservation | ||
| + | Critical Area Commission | ||
| + | Wetlands restrictions | ||
| + | o Hazardous materials | ||
| + | o Unsuitable materials | ||
| + | o Groundwater control | ||
| + | o Sensitive areas | ||
| + | o Wildlife hazard reduction | ||
| + | o Noise abatement | ||
| + | • Security | ||
| + | o Federal (DHS, FAA, FRA, DOD) | ||
| + | o Booths, gates, access control systems, fencing, barricades | ||
| + | • Safety | ||
| + | • Mitigation | ||
| + | • Special permit conditions / requirements | ||
| + | • Project Delivery | ||
| + | o Procurement method size and type of contract, accelerated schedule | ||
| + | o Business climate | ||
| + | o Project duration (time, phases, traffic maintenance, user cost) | ||
| + | Acceptable delays, number of lanes, phased impact to operations (traffic, flights, transit, etc.), signalization, signage | ||
| + | |||
| + | FACILITIES | ||
| + | |||
| + | Roadways | ||
| + | • Primary guidance | ||
| + | • Description | ||
| + | • Planning | ||
| + | o Facility selection | ||
| + | Highway | ||
| + | Other roads | ||
| + | • Terminal roadway | ||
| + | • Vehicle service roads | ||
| + | Structures? (when warranted) | ||
| + | o Design Criteria | ||
| + | Design Speed | ||
| + | • Design (include targeted) | ||
| + | • Posted | ||
| + | Interchange / Intersection | ||
| + | • At grade | ||
| + | • Full interchange | ||
| + | • Partial interchange | ||
| + | • Other | ||
| + | Preliminary Alignment | ||
| + | • Horizontal | ||
| + | • Vertical | ||
| + | Typical Section Elements | ||
| + | • Number of lanes | ||
| + | • Lane width | ||
| + | • Shoulder width | ||
| + | • Median width | ||
| + | Preliminary Hydraulics | ||
| + | • Design Elements | ||
| + | o Final Hydraulics | ||
| + | Roadside ditch | ||
| + | Inslope grade | ||
| + | Backslope grade | ||
| + | Design frequencies for storms / runoff | ||
| + | o Final Alignment | ||
| + | Horizontal | ||
| + | Vertical | ||
| + | o Pavement | ||
| + | Design criteria | ||
| + | • Design vehicles? | ||
| + | • Airport | ||
| + | • Port | ||
| + | Shoulders | ||
| + | • Urban | ||
| + | • Suburban | ||
| + | • Rural | ||
| + | Processed Materials (aggregate, asphalt, cement) | ||
| + | o Drainage | ||
| + | Storm drainage | ||
| + | • Materials | ||
| + | o Corrugated metal pipes | ||
| + | o ?? | ||
| + | o Safety | ||
| + | Rumble strips | ||
| + | Barriers | ||
| + | Pavement friction methods | ||
| + | • Saw cutting | ||
| + | • Rough surface | ||
| + | Pedestrians / bikers | ||
| + | Signalization | ||
=Facilities= | =Facilities= | ||
Revision as of 19:29, 4 August 2016
Contents
MDOT Network Primary Guidance
SYSTEM PRIMARY GUIDANCE
- New vs. reconstruction
- Design life
- Maintenance of traffic / operations
- Long term maintenance
- Expected capacity
- Level of service
Environmental (can we combine any of these?)
3Documentation (NEPA, MEPA) Constraints on sequencing and LOD limits o Permitting (MDE, USCOE, DNR, MNCPPC, EPA, NPS) Stormwater management Sediment and erosion control • Stabilization Forest conservation Critical Area Commission Wetlands restrictions o Hazardous materials o Unsuitable materials o Groundwater control o Sensitive areas o Wildlife hazard reduction o Noise abatement • Security o Federal (DHS, FAA, FRA, DOD) o Booths, gates, access control systems, fencing, barricades • Safety • Mitigation • Special permit conditions / requirements • Project Delivery o Procurement method size and type of contract, accelerated schedule o Business climate o Project duration (time, phases, traffic maintenance, user cost) Acceptable delays, number of lanes, phased impact to operations (traffic, flights, transit, etc.), signalization, signage
FACILITIES
Roadways • Primary guidance • Description • Planning o Facility selection Highway Other roads • Terminal roadway • Vehicle service roads Structures? (when warranted) o Design Criteria Design Speed • Design (include targeted) • Posted Interchange / Intersection • At grade • Full interchange • Partial interchange • Other Preliminary Alignment • Horizontal • Vertical Typical Section Elements • Number of lanes • Lane width • Shoulder width • Median width Preliminary Hydraulics • Design Elements o Final Hydraulics Roadside ditch Inslope grade Backslope grade Design frequencies for storms / runoff o Final Alignment Horizontal Vertical o Pavement Design criteria • Design vehicles? • Airport • Port Shoulders • Urban • Suburban • Rural Processed Materials (aggregate, asphalt, cement) o Drainage Storm drainage • Materials o Corrugated metal pipes o ?? o Safety Rumble strips Barriers Pavement friction methods • Saw cutting • Rough surface Pedestrians / bikers Signalization
Facilities
Roadway
Bridge
Primary Guidance
Goes Here
Description
Goes Here
Planning
- Facility Selection
- Signature (Needs to be defined. Need new name.)
- Workhorse (Needs to be defined and differentiated. Need new name.)
- Pedestrian (hiker/biker)
- Design Criteria
- Vehicle
Design Elements
- Bridge Width
- Length
- Seismic/Wind Design
- Bike Lanes
- Pedestrian Walkway
- Construction Staging
- Retaining walls
- Hydraulics
- Bridge and Culvert